1 |
Gill, H.S., Sidhu, T.S. & Sachdev, M.S. 2000. Microprocessor-based busbar protection system Generation, Transmission and Distribution, IEE Proceedings-, 147(4):252-260.
DOI
ScienceOn
|
2 |
Warrington, A.R.v.C. 1978. Erratum: Protective Relays: “Their Theory and Practice” Vol. 2. Electronics and Power, 24(8):599.
|
3 |
Kasztenny, B. & Cardenas, J. 2004, “New phase-segregated digital busbar protection solutions”, Protective Relay Engineers, 2004 57th Annual Conference for, pp. 308.
|
4 |
Yu Nan-hua & Gao Xin-Hua 2010, “Experimental research on 10kV fast busbar protection system with GOOSE technology”, Electricity Distribution (CICED), 2010 China International Conference on, pp. 1.
|
5 |
Kasztenny, B., Whatley, J., Urden, E.A., Burger, J., Finney, D. & Adamiak, M. 2006, “JEC 61850 - A Practical Application Primer for Protection Engineers”, Power Systems Conference: Advanced Metering, Protection, Control, Communication, and Distributed Resources, 2006. PS ’06, pp. 18.
|
6 |
Gustavo, B. 2003. microprocessor-based relays and enabler to scada integration. Electricity Today, Issue 4, 2003, page 10-11.
|
7 |
Duncan, B. & Self, H. 2006, “Applications and Advantages for Protection schemes using IEC 61850 Standard”, Power Systems Conference: Advanced Metering, Protection, Control, Communication, and Distributed Resources, 2006. PS '06, pp. 63.
|
8 |
Andersson, L., Brunner, C. & Engler, F. 2003, “Substation automation based on IEC 61850 with new process-close technologies”, Power Tech Conference Proceedings, 2003 IEEE Bologna, pp. 6, pp. Vol. 2.
|
9 |
IEEE Recommended Practice for Industrial and Commercial Power Systems Analysis, IEEE Std 399-1997 September
|
10 |
Thekla N. Boutsika and Stavros A. Papathanassiou, "Short-circuit calculations in networks with distributed generation," Elsevier ScienceDirect, Electric Power Systems Research, Dec. 2007.
|
11 |
Network protection automation guide first adition July 2002 htpp://www.areva-td.com.
|
12 |
ABB-Oy, D.A. 2011. Distribution Automation Handbook. FI-65101 Vaasa, FINLAND).
|
13 |
B.C. Sung, and S.H Lee, "Adaptive Protection Alogorithm for Overcurrent Relay in Distribution system with DG," JEET Vol. 8, No. 5 pp.1002-1011, Korea, School of Electrical and Electronic Engineering, Yonsie University May 2013.
|
14 |
H.J. Lee, G. T. Son, and J.W. Park, "Study on Wind-Turbine Generator System Sizing Considering Voltage Regulation and Overcurrent Relay Coordination," IEEE Trans. Power Systems, vol. 26, no. 3, pp. 1283-1293, Aug. 2011.
DOI
ScienceOn
|
15 |
Bertil, L., Berith, B. & Torbjörn, E. 2007. A user friendly implementation of IEC 61850 in a new generation of protection and control devices ABB Power Technologies AB (Sweden)
|
16 |
Wireshark Network Analyser software. Available from: http://www.wireshark.org/ [27 March 2014]
|
17 |
Mnguni, M., 2014.Investigation of the application of IEC 61850 standard in distribution busbar protection schemes Cape Peninsula University of Technology (South Africa)
|
18 |
Jiaying Miao; Dostanov, D.; Redfern, M. Using IEC 61850 Data Transfere beyond the Substation for Enhanced Protection for distribution Networks, Power Engineering Conference (UPEC), 2013 48th International Universities'
|