1 |
T. L. Baldwin, L. Mili, M. B. Boisen, Jr., and R. Adapa, “Power system observability with minimal phasor measurement placement”, IEEE Trans. Power Syst., vol. 8, no. 2, , pp. 707-715, May, 1993.
DOI
ScienceOn
|
2 |
Nikolaos C. Koutsoukis, Nikolaos M. Manousakis, Pavlos S. Georgilakis, George N. Korres, “Numerical observability method for optimal phasor measurement units placement using recursive tabu search method”, IET Generation, Trans & Dist, vol. 7, pp. 1-10, 2013.
DOI
ScienceOn
|
3 |
http://www.pserc.cornell.edu/matpower.
|
4 |
Yang, X. S. Nature-Inspired Metaheuristic Algorithms, 1st edition. Lunver Press, UK, 2008.
|
5 |
Rajesh Kavasseri, and Sudarshan K. Srinivasan, “Joint placement of phasor and power flow measurements for observability of power systems”, IEEE Trans. Power Systems, vol. 26, no. 4, pp. 1929-1936, Nov, 2011.
DOI
ScienceOn
|
6 |
A. Ahmadi, Y. Alinejad Beromi, M. Moradi, “Optimal PMU placement for power system observability using binary particle swarm optimization and considering measurement redundancy”, Expert System Applications, vol. 38, no. 6, pp. 7263-7269, 2011.
DOI
ScienceOn
|
7 |
Dua, S. Dambhare, R.K. Gajbhiye and S.A. Soman, “Optimal multistage scheduling of PMU place-ment: An ILP approach”, IEEE Trans. Power Delivery, vol. 23, no. 4, pp. 1812-1820. Oct, 2006.
DOI
|
8 |
K. Chandrasekaran and Sishaj P. Simon, “Firefly algorithm for reliable/emission/economic dispatch multi objective problem”, Int. Review of Electrical Engineering, vol. 7, no. 1, Part A, 2012, pp. 199-210.
|
9 |
K. Chandrasekaran and Sishaj P. Simon, “Network and reliability constrained unit commitment problem using binary real coded firefly algorithm”, Electrical Power and Energy Systems, vol. 43, no. 1, 2012, pp. 921-932.
DOI
ScienceOn
|
10 |
K. Chandrasekaran and Sishaj P. Simon, “Optimal deviation based firefly algorithm tuned fuzzy design for multi-objective UCP”, IEEE Trans. Power Systems, vol. 28, no. 1, 2013, pp. 460- 471.
DOI
ScienceOn
|
11 |
Seyed Mahdi Mazhari, Hassan Monsef, Hamid Lesani, Alireza Fereidunian, “A multi-objective PMU placement method considering measurement redundancy and observability value under contingencies”, IEEE Trans. Power Systems, vol. 28, no. 3, pp. 2136- 2146, August, 2013.
|
12 |
Farrokh Aminifar, A. Khodaei, M. Fotuhi-Firuzabad, M. Shahidehpour, “Contingency con-strained PMU placement in power networks”, IEEE Trans. Power Systems, vol. 25, pp. 516-523, Feb, 2010.
DOI
ScienceOn
|
13 |
B. Gou, “Generalized integer linear programming formulation for optimal PMU Placement”, IEEE Trans. Power Syst., vol. 23, no. 3, pp. 1099-1104, 2008.
DOI
ScienceOn
|
14 |
Ali Enshaee, Rahmat Allah Hooshmand, Fari-borzag Haghighatdar Fesharaki, “A new method for optimal placement of phasor measurement units to maintain full network observability under various contingencies”, Elect. Power Systems Research, vol. 89, pp. 1- 10, 2012.
DOI
ScienceOn
|
15 |
Arash mahari, Heresh Seyedi, “Optimal PMU placement for power system observability using BICA, considering measurement redundancy”, Elect. Power System Research, vol. 103, pp. 78-85, 2013.
DOI
ScienceOn
|
16 |
Nikolaos M. Manousakis, George N. Korres, and Pavlos S. Georgilakis, “Taxonomy of PMU placement methodologies”, IEEE Trans. Power Systems, vol. 27, no. 2, pp. 1070-1077, 2012.
DOI
ScienceOn
|
17 |
B. Xu, Y. J. Yoon, and A. Abur, “Optimal placement and utilization of phasor measurements for state estimation”, PSERC Publications, 2005.
|
18 |
Farrokh Aminifar, Caro Lucas, Amin Khodaei, and Mahmud Fotuhi-Firuzabad, “Optimal placement of phasor measurement units using immunity genetic algorithm”, IEEE Trans. Power Delivery, vol. 24, no. 3, pp. 1014-1020, 2009.
DOI
ScienceOn
|
19 |
S. Chakrabarti, E. Kyriakides, “Optimal placement of phasor measurement units for power system observability”, IEEE Trans. Power Systems, vol.23, Aug, 2008, pp.1433-1440.
DOI
ScienceOn
|
20 |
F. J. Marin, F. Garcia-Lagos, G. Joya, and F. Sandoval, “Genetic algorithms for optimal placement of phasor measurement units in electric networks,” Electron. Lett, vol. 39, no. 19, pp. 1403-1405, 2003.
DOI
ScienceOn
|
21 |
M. Hajian, A.M. Ranjbar, T. Amraee, B. Mozafari, “Optimal placement of PMUs to maintain network observability using a modified BPSO algorithm”, Int. Journal of Electrical Power and Energy Systems, vol. 33, pp. 28-34, Jan, 2011.
DOI
ScienceOn
|
22 |
Amany El-zonkoly, Samah El-safty, Rana Maher, “Optimal placement of PMUs using improved tabu search for complete observability and out-of-step prediction”, Turkish Journal of Electrical Engg & Computer Sciences, vol.21, pp.1376-1393, 2013.
|
23 |
X.S. Yang, Firefly algorithms for multimodal optimization, in: Stochastic Algorithms: Foundations and Applications, Lecture Notes in Computer Sciences, vol. 5792, 2009, pp. 169-178.
|
24 |
Mao, J. Yu, Z. Guo, “PMU placement and data processing in WAMS that complements SCADA”, in IEEE Power Engineering Society General Meeting, vol. 1, pp. 780-783, June, 2005.
|
25 |
Sood Yog Raj, “Evolutionary programming based optimal power flow and its validation for deregulated power system analysis”, Int. Journal of Electrical Power and Energy Systems, vol. 29, pp. 65-75, 2007.
DOI
ScienceOn
|
26 |
Final report on the august 14, “2003 black out in the United States and Canada: Causes and Recommendations April 5, U.S- Canada power system outage task force”, pp.139- 140, 2004.
|
27 |
P. Acharjee, “Identification of maximum loadability limit and weak buses using security constraint genetic algorithm”, Electrical Power and Energy Systems, vol. 36, pp. 40-50, 2012.
DOI
ScienceOn
|
28 |
Saikat Chakrabarti, Elias Kyriakides, Demetrios G. Eliades, “Placement of Synchronized Measurements for Power System Observability”, IEEE Trans. Power Delivery, vol. 24, no. 1, pp. 12-19, January, 2009.
DOI
|
29 |
Jaime De La Ree, Virgilio Centeno, James S. Thorp, and A. G. Phadke, “Synchronized phasor measurement applications in power systems”, IEEE Trans. Smart grid, vol. 1, no. 1, pp. 20-27, 2010.
DOI
ScienceOn
|
30 |
A Report of Power Grid Corporation of India, Gurgaon, “Unified real time dynamic state measurement”, Feb, 2012.
|