Abstract
Installed capacity markets in the northeast of the United States ensure that adequate generation exists to satisfy regional loss of load probability (LOLP) criterion. LOLP studies are conducted to determine the amount of capacity that is needed, but they do not consider several factors that substantially affect the calculated distribution of available capacity. These studies do not account for the fact that generation availability increases during periods of high demand and therefore prices, common-cause failures that result in multiple generation units being unavailable at the same time, and the negative correlation between load and available capacity due to temperature and humidity. A categorization of incidents in an existing bulk power reliability database is proposed to analyze the existence and frequency of independent failures and those associated with resource dynamics. Findings are augmented with other empirical findings. Monte Carlo methods are proposed to model these resource dynamics. Using the IEEE Reliability Test System as a single-bus case study, the LOLP results change substantially when these factors are considered. Better data collection is necessary to support the more comprehensive modeling of resource adequacy that is proposed. In addition, a parallel processing method is used to offset the increase in computational times required to model these dynamics.
Keywords
electric power industry restructuring; installed capacity; loss of load probability (LOLP); Monte Carlo; power system reliability;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 F. A. Felder, 'Probabilistic Risk Analysis of Restructured Electric Power Systems: Implications for Reliability Analysis and Policies, PhD. Dissertation Department of Technology, Management and Policy, M.I.T. Cambridge, MA 2001
2 F. A. Felder, '' An Island of Technicality in a Sea of Discretion': A Critique of Existing Electric Power Systems Reliability Analysis and Policy,' The Electricity Journal, April 2001, pp. 21-31
3 W. Li and R. Billinton, 'Common Cause Outage Models in Power System Reliability Evaluation,' IEEE Transactions on Power System, Vol. 18, No.2, pp. 966-968, May 2003   DOI   ScienceOn
4 U.S. Department of Energy, Report of the U.S. Department of Energy's Power Outage Study Team: Findings and Recommendations to Enhance Reliability From the Summer of 1999, Final Report, March 2000
5 Whitlock, Jeremy, The Canadian Nuclear FAQ, http://www.ncf.carleton.cal-cz725/. as of August 6, 2000
6 H. M. Merrill, G. Lawrence, and S. Lawrence, 'Understanding New England Generating Unit Availability,' June 14, 2001
7 Electricity Daily, 'ISO-NE to Examine Gas Infrastructure,' Volume 14, Number 88, May 8, 2000
8 Electricity Daily, 'AEP's Long Nuclear Nightmare Ending,' Volume 14, Number 111, June 9, 2000
9 PriceWaterhouseCoopers, ISO New England Inc. Operational Study: Final Report, June 7, 2000
10 NERC, '1997 Summer Assessment: Reliability of Bulk Electricity Supply in North America,' May 1997
11 http://www.nerc.com/dawg/append-a.html. (NERC DAWG webpage)
12 R. Billinton and R. N. Allan, Reliability Evaluation of Power Systems, 2nd ed., New York: Plenum Press, 1996
13 NERC, 'Report on Electric Utilities' Response to the Cold Wave of January 1994: Report by the Blue Ribbon Task Force to the NERC Board of Trustees,' April 11, 1994
14 Allan, R. N., R. Billinton, and N. M. K. AbdelGawad, 'The IEEE Reliability Test System Extensions to and Evaluation of the Generating System,' IEEE Power Engineering Society, 1986 Winter Meeting, New York, New York, February 2-7, 1986
15 Y. T. Yoon and F. A. Felder, 'A Critique of Designing Resource Adequacy Markets to Meet Loss of Load Probability Criterion,' KIEE International Transactions on Power Engineering, Vol. 3-A, No 1, pp. 35-41, 2003
16 Electric Utility Week, 'ISO-New England Study Casts Doubt on Claims of Gaming by Generators,' June 25, 2001, p. 17
17 H. Kumamoto and E. J. Henley, Probabilistic Risk Assessment and Management for Engineers and Scientists, 2nd Edition, New York: IEEE Press, 1996
18 NERC, '1996 Summer Assessment: Reliability of Bulk Electricity Supply in North America,' May 1996
19 NERC, 'Seasonal Performance Trends: Peak Season Equivalent Forced Outage Rate Trend Evaluations for Fossil-Steam Generating Units,' June 1991