1 |
KHNP, Reactor shutdown by pipe wall thinning in Ohi unit 2 of Japan, 2008-007, Technical Information Report (2007).
|
2 |
EPRI, Recommendations for Controlling Cavitation, Flashing, Liquid Droplet Impingement, and Solid Particle Erosion in Nuclear Power Plant Piping Systems, 1011231, Palo Alto, p. 2-7 (2004).
|
3 |
D. Y. Lee, H. K. Suh, and K. M. Hwang, Corros. Sci. Tech., 11, 89 (2012).
DOI
|
4 |
K. M. Hwang, S. H. Park, and K. H. Kim, Microsystem Technologies, 16, 1945 (2010).
DOI
ScienceOn
|
5 |
FLUENT, Fluent Tutorial Guide, p. 20.1, Fluent Inc. (2001).
|
6 |
D. F. Tatterson, J. C. Dallman, and T. J. Hanratty, AIChE Journal, 23, 68 (1997).
|
7 |
G. J. Keck and P. Griffith, Prediction and Mitigation of Erosive-Corrosive Wear in Secondary Piping Systems of Nuclear Power Plants, NUREG/CR-5007 R5, USNRC, p. 3 (1987).
|