Browse > Article
http://dx.doi.org/10.1007/s40069-016-0156-5

Mechanical Performance and Stress-Strain Relationships for Grouted Splices Under Tensile and Cyclic Loadings  

Lin, Feng (Department of Structural Engineering, Tongji University)
Wu, Xiaobao (Department of Structural Engineering, Tongji University)
Publication Information
International Journal of Concrete Structures and Materials / v.10, no.4, 2016 , pp. 435-450 More about this Journal
Abstract
Experimental studies were conducted on 36 grouted splices to investigate their mechanical performance under four loading schemes: (1) incremental tensile loading, (2) repeated tensile loading, (3) cyclic loading at high stress, and (4) cyclic loading at large strain. Load-deformation responses of the grouted splices under cyclic loadings were featured with pinching effect and stiffness degradation compared to those responses under tensile loadings. The shape of the hysteresis loops of load-deformation curves was similar to that under incremental tensile loading. For the purpose of structural analysis, stress-strain relationships were presented for grouted splices under various loadings.
Keywords
sleeve connector; grouted splice; cyclic loading; stress-strain relationship;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Hayashi, Y., Nakatsuka, T., Miwake, I., & Suzuki, K. (1997). Mechanical performance of grout-filled coupling steel sleeves under cyclic loads. Journal of Structural and Construction Engineering, Architectural Institute of Japan, 496, 91-98 (in Japanese).
2 Henin, E., & Morcous, G. (2015). Non-proprietary bar splice sleeve for precast concrete construction. Engineering Structures, 83, 154-162.   DOI
3 ICC Evaluation Service Inc, AC133. (2014). Acceptance criteria for mechanical connector systems for steel reinforcing bars. Birmingham, AL: ICC Evaluation Service, Inc., AC133.
4 International Federation for Structural Concrete. (2010). Model code 2010. Lausanne, Switzerland: FIB Bulletin.
5 Jansson, P. O. (2008). Evaluation of grout-filled mechanical splices for precast concrete construction. Lansing, MI: Michigan Department of Transportation.
6 JGJ355-2015. (2015). Technical specification for grout sleeve splicing of rebars. Beijing: Ministry of Housing and Urban-Rural Development of the People's Republic of China, China Architecture & Building Press.
7 Kim, D. K. (2016). Seismic response analysis of reinforced concrete wall structure using macro model. International Journal of Concrete Structures and Materials. doi:10.1007/s40069-016-0131-1.   DOI
8 Kim, H. K., & Lee, S. H. (2012). Lateral confining action of mortar-filled sleeve reinforcement splice. Structural Engineering and Mechanics, 41(3), 379-393.   DOI
9 Ling, J. H., Rahman, A. B. A., & Ibrahim, I. S. (2014). Feasibility study of grouted splice connector under tensile load. Construction and Building Materials, 50, 530-539.   DOI
10 Ling, J. H., Rahman, A. B. A., Ibrahim, I. S., et al. (2012). Behaviour of grouted pipe splice under incremental tensile load. Construction and Building Materials, 33, 90-98.   DOI
11 Einea, A., Yamane, T., & Tadros, M. K. (1995). Grout-filled pipe splices for precast concrete construction. PCI Journal, 40(1), 82-93.
12 Ren, W., Sneed, L. H., Yang, Y., & He, R. (2015). Numerical simulation of prestressed precast concrete bridge deck panels using damage plasticity model. International Journal of Concrete Structures and Materials, 9(1), 45-54.   DOI
13 Steuck, K. P., Eberhard, M. O., & Stanton, J. F. (2009). Anchorage of large-diameter reinforcing bars in ducts. ACI Structural Journal, 106(4), 506-513.
14 Teng, Z. M., & Zou, L. X. (1996). Nonlinear finite element analysis of RC members under reversed cyclic loading. China Civil Engineering Journal, 29(2), 19-27 (in Chinese).
15 Yee, A. (1973). New precast prestressed system saves money in Hawaii hotel. PCI Journal, 18(3), 10-13.
16 Ameli, M. J., Parks, J. E., Brown, D. N., & Pantelides, C. P.(2015). Seismic evaluation of grouted splice sleeve connections for reinforced precast concrete column-to-cap beam joints in accelerated bridge construction. PCI Journal, 60(2), 80-103.   DOI