Browse > Article

Applying Theory of Constraint on Logistic Management in Large Scale Construction Sites - A Case Study of Steel Bar in TFT-LCD Factory Build-Up  

Huang, Chih-Yao (Department of Industrial Engineering and Management National Chiao-Tung University)
Chen, Ching-Piao (Department of Industrial Engineering and Management Ta-Hwa Institute of Technology)
Li, Rong-Kwei (Department of Industrial Engineering and Management National Chiao-Tung University)
Tsai, Chih-Hung (Department of Industrial Engineering and Management Ta-Hwa Institute of Technology)
Publication Information
International Journal of Quality Innovation / v.9, no.1, 2008 , pp. 68-93 More about this Journal
Abstract
The steel bars account for a high percentage of material costs for the current construction projects. At the present time, most of the construction projects for the factories of thin-film transistor liquid crystal display (TFT-LCD) complete the transactions of steel bars when the suppliers ship the steel bars to the temporary storage/processing sites. This paper applies the buy-in concept in the Theory of Constraint (TOC) on the supply chain of steel bars. In this study, suppliers are required to establish warehouses at the construction sites and complete the transactions when the formed and processed steel bars are shipped into the factory sites. The aim is to find a win-win solution to meet with the expectations from constructors as they hope that there is no need to build up inventories but supply is ready at any time. Also, this paper compares and analyzes the traditional supply/inventory model of steel bars and the Demand-Pull (D-P) model under the TOC framework. It is proved that Vendor Management Inventory (VMI) in the D-P model is able to more effectively manage steel bars as a material.
Keywords
Theory of Constraint; Steel Bar; Thin-film Transistor Liquid Crystal Display(TFT-LCD);
Citations & Related Records
연도 인용수 순위
  • Reference
1 Stevens, G.(1989), "Integrating the Supply Chain," International Journal of Physical Distribution and Materials Management, Vol. 19, No. 8, pp. 3-8
2 Walton, L.(1996), "Partnership Satisfaction: Using the Underlying Dimensions of Supply Chain Partnership to Measure Current and Expected Levels of Satisfaction," Journal of Business Logistics, Vol. 17, No. 2, pp. 57-75
3 Weng, L. Y.(2004), "Empirical Study of TOC in Distribution Management," Master's Thesis, Department of Industrial Engineering and Management, National Chiao-Tung University, Taiwan
4 Wrigley, C. D., R. W. Wagenar, and R. A. Clarke(1994), "Electronic Data Interchange in International Trade: Frameworks for the Strategic Analysis of Ocean Port Communities," Journal of Strategic Information Systems, Vol. 3, No. 3, pp. 211-234   DOI   ScienceOn
5 Wigand, R.(1997), "Electronic Commerce: Definition, Theory, and Context," The Information Society, Vol. 13, No. 13, pp. 1-16   DOI   ScienceOn
6 Chang, J. B.(2004), "Construction of TOC Management Model," Master's Thesis, Department of Industrial Engineering, Chung-Yuan Christian University, Taiwan
7 Eliyahu M. Goldratt, Eli Schrahenheim, and Carol A. Ptak(2004), "Necessary but Not Sufficient," trans by Luo, C. Y., Taipei: Book Zone
8 Williams, L., N. Avril, I. Dimples, and T. Finley(1997), "Logistics Integration: The Effect of Information Technology, Team Composition, and Corporate Competitive Positioning," Journal of business logistics, Vol. 18, No. 2, pp. 31-41
9 Swatman, P. M. C., P. A. Swatman, and D. C. Fowler(1994), "A Model of EDI Integration and Strategic Business Reengineering," Journal of Strategic Information Systems, Vol. 3, No. 1, pp. 41-60   DOI   ScienceOn
10 Simchi-Levi, D., P. Kaminsky, and E. Simchi-Levi(2001), "Designing and Managing the Supply Chain," the McGraw-Hill Companies
11 Eliyahu M. Goldratt(2004), "Critical Chain," trans by Luo, C. Y., Taipei: Book Zone
12 Eliyahu M. Goldratt(2004), "It's Not Luck," trans by Chou, Y. L., Taipei: Book Zone
13 Eliyahu M. Goldratt and Jeff Cox(2005), "The Goal-A Process of Ongoing Improvement," trans by Chi, R. L., Taipei: Book Zone
14 Liao, G. C.(1994), "Construction Management," Scientific and Technical Publishing Co. Ltd
15 Eliyahu M. Goldratt(1998), "Project Management the TOC Way," The North River Press