Browse > Article

Analysis and Compare for Control Charts Under the Changed Alarm Rule  

Haiyu Wang (Northwestern Poly technical University)
Jichao Xu (Zhengzhou Institute of Aeronautics)
Park, Young H. (Kangnam University)
Publication Information
International Journal of Quality Innovation / v.4, no.2, 2003 , pp. 65-72 More about this Journal
Abstract
This paper mainly studies to build control charts under different alarm rule. For different alarm rule, the control limit parameters of a control chart should be changed, then some kinds of control schemes under different alarm rule were compared and the methods of calculating ARL for different control schemes were given.
Keywords
alarm rule; Average Run Length; Markov chain;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Nelson, L.S.(1984), The Shewhart Control Chart-Tests for special causes. Journal of Quality Technology, No.16, pp. 237-239
2 Hurwitz, A. M. and Mathur, M (1992), A Very Simple Set of Process Control Rules. Quality Engineering, No.5, pp. 21-29
3 Andrew C. Palm, (1990,October), Tables Of Run Length Percentiles For Determining The Sensitivity Of Shewhart Control Charts For Averages With Supplementary Run Rules, Journal of Quality Technology, Vol. 22, No.4
4 Morton Klein, (2000,October), Two Alternatives to The Shewhart X-Bar Control Chart, Journal of Quality Technology, No.4