Abstract
The purpose of this study is to develop a device to replace the pre-boring method, which is generally constructed, to prevent pile damage caused by tension cracks that reason from tension waves generated during PHC pile construction on soft ground. Tension cracks are caused by tension waves from the hammer striking during the PHC pile hitting on the soft ground, which in turn leads to faulty construction. In order to prevent the occurrence of tension waves generated during driving, apply separate driving force increasing device to prevent the generation of tension waves, and pile damage as well. Also, it is an eco-friendly construction method that reduces smoke and noise by improving construction speed, reducing construction costs, and able to small equipment when developing equipment. This development equipment is a piece of effective equipment that can pioneer the Saemangeum reclamation area, the South-east Asian construction market, where the Deep soft ground is distributed.
Keywords
Soft ground; Pre-boring; PHC pile; Pile driving; Tension crack; Driving force increase device;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 N. H. Kim. (2014). Analysis of drivability and constructability for Spun Pile into special ground conditions. Youshin Technology Newsletter, 80-89.
2 G. S. Woo, (2016). Evaluation of Allowable Bearing Capacity of 600mm Diameter Preboring PHC Piles Using Dynamic Load Test. Journal of The Korea Geotechnical Society Vol32,No11, 61-72   DOI
3 K. J. Cho. (2010). Evaluation of the tip resistance of prebored PHC pile on weathered rock. KSCE 2010. 990-993
4 D. G. Kim. (2017). High strength and ultra high strength PHC pile test case with high design load. KSCE 2017. 55-56
5 E. A. Hwang. (2017). Suggestion of New Pre-drilling Method for Soft Soils using Multiple Auger Boring Machine Equipped with Wire Ropes. KSCE Vol65No09. 41-45
6 S. S. Jeong. (2015) Analysis of Load Sharing Ratio for PHC Piled-raft Foundation. KSCE 81-82
7 H. K. Choi. (2015). A study on the Installation of the Point Foundation as the Substitution method of the soft ground. KSCE 45-46
8 W. P. Hong. (1987). Deep foundation of soft ground. KSCE Vol35.No6. 11-14
9 C. H. Cho. (2004). PHC PILE cracking related technology cases in soft ground. Samsung E&C Technical Information, 15-17.
10 J. Y. Ko. (2015). Proposed Bearing Capacity for Open-Ended Piles with Soil Plugging. KSCE 47-48
11 K. W. Lee. (1996). Problems and countermeasures in design and construction of ready-made concrete pile foundation. Construction technology Ssangyong.
12 W. J Lee. (2015). The proposal to Design PHC Piles Properly when used for Civil Engineering Structures. KSCE 163(11), 52-60
13 J. M. Goo. (2008) Micropiling: Case History and the Improvement of Design Method. KSCE 865-868
14 Y. H. Lee, (2007). Example of construction method for applying PHC file in soft ground. Geotechnical Engineering 23(7), 9-21
15 B. K. Kim. (2016) Preliminary study on the Underwater Noise Mitigation Device under Offshore Pile Driving. KSCE. 78-79