Production Process Analysis based on Information Strategy Planning with Present Condition Diagnosis of Small FRP Shipyards |
Kim, Hyun-Woo
(Division of Ocean ICT & Advanced Materials Technology Research, Research Institute of Medium & Small Shipbuilding)
Hwang, Hun-Gyu (Division of Ocean ICT & Advanced Materials Technology Research, Research Institute of Medium & Small Shipbuilding) Shin, Il-Sik (Division of Ocean ICT & Advanced Materials Technology Research, Research Institute of Medium & Small Shipbuilding) Cho, Je-Hyoung (Division of Ocean ICT & Advanced Materials Technology Research, Research Institute of Medium & Small Shipbuilding) |
1 |
Hwang, I.H. Noh, J. Lee, K.K. & Shin, J.G., 2010. Short-term Scheduling Optimization for Subassembly Line in Ship Production Using Simulated Annealing. |
2 |
Hwang, I.H., 2014. |
3 |
Kim, K.D. Jeon, I.W. & Kim, T.H. 2002. |
4 |
Lamb. T., 2004. |
5 |
Lee, D.K. Back, M.G. Lee, K.K. Park, J.S. & Shin, J.G., 2013. Study on Simulation Model Generation of a Shipyard Panel Block Shop Using a Neutral Data Format for Production Information. |
6 |
Lee, J.H. Lee, P.L. Yoon, K.W. & Nam, J.H., 2014. Quality Verification of Legacy Data of Manufacturing Information System to Improve Results of Shipyard Manufacturing Logistics Simulation. |
7 |
Lee, J.M., 2007. |
8 |
Lee, S.J. & Kim, S.H., 2011. Heuristic method of load leveling for optimal production in shipyard. |
9 |
Woo, J.H. Hwang, Y.S. & Nam, J.H., 2016. An Approach for Construction of Shipyard Simulation Environment based on Neutral File Format. |
10 |
Son, M.J. & Kim, T.W., 2013. Job Assignment Simulation of Ship Hull Production Design in Consideration of Mid-Term Schedule. |
11 |
Choi, H. R. Ryu, K.R. Cho, K.K. Lim, H.S. & Hwang, J.H., 1996. A Scheduling System for Panel Block Assembly Shop in Shipbuilding Using Genetic Algorithms. |
12 |
Baek, T.H. Chung, K.H. & Park, J.C., 1999. A Study on the Application of Resource Leveling Heuristic for Ship Erection Scheduling. |