A Study on the Feasibility Analysis and Capacity Estimation of BESS for Self-Starting Generators |
Kim, Cha-Nyeon
(Dept. of Electrical and Electronic Engineering, Kwangwoon University)
Yu, Won-Kun (Dept. of Electrical and Electronic Engineering, Seoil University) kim, Heon-Tae (Dept. of Ministry of Trade, Industry and Energy Notification) Lee, Heung-Jae (Dept. of Electrical and Electronic Engineering, Kwangwoon University) |
1 | Heung-Jae Lee, Won-Kun Yu, "A Study on the Damping Loads Prediction to prevent Harmonic Resonance during the Power System Restoration", The transactions of The Korean Institute of Electrical Engineers, Vol. 62, Issue 7, pp. 913-917, 2013. DOI |
2 | "Use of Large Scale Energy Storage for Transmission System Support", EPRI Report, 2013. |
3 | Thien, Tjark, et al. "Planning of grid-scale battery energy storage systems: Lessons learned from a 5 MW hybrid battery storage project in germany", Proc. BATTCON Int. Battery Conf. 2015. |
4 | Weijia Liu, Lei Sun, Zhenzhi Lin, Fushuan Wen and Yusheng Xue. "Multi-objective restoration optimisation of power systems with battery energy storage systems", IET Generation, Transmission & Distribution, Vol 10, Issue 7, pp. 1749-1757, 2016 DOI |
5 | Dan Wu,Fen Tang, Josep M. Guerrero,Juan C. Vasquez, Guoliang Chen and Libing Sun, "Autonomous active and reactive power distribution strategy in islanded microgrids", Applied Power Electronics Conference and Exposition (APEC), 2014 Twenty-Ninth Annual IEEE. pp. 2126-2131, 2014. |
6 | Bahrman, Michael, and Per-Erik Bjorklund. "The new black start: system restoration with help from voltagesourced converters", IEEE Power and Energy Magazine, Vol. 12, Issue 1, pp. 44-53, 2014 DOI |
7 | Kannan, A., and R. Kayalvizhi. "Modeling and implementation of dq control system for a unified power flow controller", International Journal of Engineering and Technology, Vol. 2, Issue 6, pp. 450-457, 2010. |
8 | PSCAD_User_Guide_v4_3_1 |