1 |
A. J. Conejo, L. Baringo Morales, S. J. Kazempour, and A. S. Siddiqui, Investment in Electricity Generation and Transmission, no. May. Cham: Springer International Publishing, 2016.
|
2 |
T. Nakawiro, S. C. Bhattacharyya, and B. Limmeechokchai, "Electricity capacity expansion in Thailand: An analysis of gas dependence and fuel import reliance," Energy, vol. 33, no. 5, pp. 712-723, May 2008.
DOI
|
3 |
S. Burns and G. Gross, "Value of service reliability," IEEE Trans. Power Syst., vol. 5, no. 3, pp. 825-834, 1990.
|
4 |
M. Milligan, B. A. Frew, A. Bloom, E. Ela, A. Botterud, A. Townsend, and T. Levin, "Wholesale electricity market design with increasing levels of renewable generation: Revenue sufficiency and long-term reliability," Electr. J., vol. 29, no. 2, pp. 26-38, 2016.
DOI
|
5 |
R. R. Booth, "Power System Simulation Model Based on Probability Analysis," IEEE Trans. Power Appar. Syst., vol. PAS-91, no. 1, pp. 62-69, 1972.
|
6 |
E. G. Preston and W. M. Grady, "Efficient method for calculating power system production cost and reliability," IEE Proc. C Gener. Transm. Distrib., vol. 138, no. 3, p. 221, 1991.
DOI
|
7 |
International Atomic Energy Agency, "Wien Automatic System Planning(WASP) Package User's Manual," 2006.
|
8 |
Korea Power Exchange, "Capacity Payments Redesign and the Introduction of a Capacity Market in the Korean Electricity Market," 2014.
|
9 |
A. Soroudi, Power System Optimization Modeling in GAMS. 2017.
|
10 |
H. Kim, S. Lee, and W. Kim, "Impact of Maintenance Outage Rate Modeling on the Minimum Reserve Rate in Long-term Generation Expansion Planning," Trans. Korean Inst. Electr. Eng., vol. 66, no. 12, pp. 1712-1720, 2017.
DOI
|
11 |
J. Hoffer, "Modelling the partial planned outages in production costing simulation," Int. J. Electr. Power Energy Syst., vol. 17, no. 6, pp. 377-380, 1995.
DOI
|
12 |
J. Kim and J. Park, "Probabilistic Generation Modeling in Electricity Markets Considering Generator Maintenance Outage," Trans. Korean Inst. Electr. Eng. A, vol. 54A, no. 8, pp. 418-425, 2005.
|
13 |
The ministry of knowledge economy, "The 7th Basic Plan for Long-term Electricity Supply and Demand (2015-2029)," 2015.
|
14 |
Korea Power Exchange, "A study on pump storage power plant operation considering system reliability," 2013.
|
15 |
IAEA, "Wien Automatic System Planning (WASP) Package: A Computer Code for Power Generating System Expansion Planning - Version WASP-IV - User's Manual," Int. At. Energy Agency, no. 16, 2001.
|
16 |
Korea Power Exchange, "Outage Statistics of Power Plant(2013)," 2014.
|
17 |
R. E. Rosenthal, "GAMS - A User's Guide," no. December, 2014.
|
18 |
Korea Power Exchange, "Power Plant Status (2016)," 2017.
|
19 |
Korea Power Exchange, "Outage Statistics of Power Plant(2012)," 2013.
|
20 |
Korea Power Exchange, "Outage Statistics of Power Plant(2014)," 2015.
|