Development of New Effectiveness Assessment Indices of Pumped Storage Power Plant  

Lee, Sung-Hun (Dept. of Electrical Engineering, Gyeonsang National University)
Choi, Jae-Seok (Dept. of Electrical Engineering, Gyeongsang National University)
Cha, Jun-Min (Dept. of Electrical Engineering, Daejin University)
Kim, Daniel (Korea Hydro & Nuclear Power Co., LTD.)
Publication Information
The Transactions of The Korean Institute of Electrical Engineers / v.63, no.7, 2014 , pp. 867-874 More about this Journal
Abstract
The pumped storage power plants have excellent load following characteristics. It can also be committed quickly for synchronous reserve when it is in the generating mode because it can readily increase its generating power and, consequently, increases the overall system reliability. There are strong incentives for standing the system reliability. Additionally, $CO_2$ emission can be typically impacted due to operation of pumped generators. The increase or decrease of $CO_2$ depends on the generation mix. This paper proposes evaluation of reliability, economy and environment of power system considering pumped generator. This paper describes three case studies of the reliability and economy and environment according to capacity factor and storage capacity of pumped generators. The probabilistic production simulation model is used in this paper. The practicality and effectiveness of the proposed approach are demonstrated by simulation studies for a real size power system model on the $5^{th}$ power plan in Korea.
Keywords
Pumped storage power plant(PSPP); New effectiveness assessment algorithm; Energy storage system(ESS); Performance index(PI);
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Jeongje Park, Jaeseok Choi, Ungki Baek, Junmin Cha and Kwang Y. Lee, "Flexible Maintenance Scheduling of Generation System by Multi-Probabilistic Reliability Criterion in Korea Power System", KIEE, Journal of Electrical Engineering & Technology, Vol. 5, No. 1, pp. 8-15, March. 2010.   과학기술학회마을   DOI   ScienceOn
2 Jeongje Park, Kyeonghee Cho, Jaeseok Choi, Ungki Baek, "A Study on the Balanced Generators Maintenance Scheduling of Generation Companies", 2009 KIEE Power System Research Association Autumn Conference,, pp.61-63, November, 2009.
3 Jeongje Park, Jaeseok Choi, Yong-Bum Yun, Young-Bum Jung, "A Study on Decision of Optimum Installed Reserve Rate using Probabilistic Reliability Criterion" KIEE, Journal Vol. 57, No. 8, pp.1318-1326, August, 2008.   과학기술학회마을
4 J.S. Choi, D.H. Do, 1997, "Development of a Method for the Generator Maintenance Scheduling using Fuzzy Integer Programming, Journal of KFIS", Vol. 7, No. 5, pp.77-85, December, 1997.   과학기술학회마을
5 KEPCO, "Development of Reliability & Economics Evaluation Models for Optimal Grid Expansion Planning" KEPRI Final Report, August 31, 2012.
6 Jin-Teak Lim, Jae-Seok Choi, Kyengsoo Park, Yonggyo Lee, "Reliability Evaluation and CO2 Emission Assessment of Power System Considering Pumped Generators", 2012KIEE Power System Research Association Summer Conference, pp.332-333, July. 2012
7 Jaeseok Choi, "Power System Reliability Evaluation Engineering" G&U Publishing Co., 2012.
8 J.S. Choi, Kil-Yeong Song, "A Study On the Generator Maintenance Scheduling", 1985 KIEE Power System Research Association Summer Conference, pp.148-151, July, 1985.