1 |
Young-Han Gwon, Ji-Young Kim, "Environmental Consideration for Small Hydro Power Plant Development Projects", KEI, WO-14, 2006.
|
2 |
Kyun-Nam Kim, Bum-Soo Kim, Jeong-Ho Kim "Status and challenges of small hydropower in Gangwon Province", Research Institute for GangWon, 2010.
|
3 |
Bum-Soo Kim, Kyung-Nam Kim, Research Institute for Gangwon, "Issues that should be considered when introducing and Small Hydro Power Generation characteristics", 2009.
|
4 |
G. B. Lee, E. W. Lee, "Overview and Trend of Small hydropower Development in Korea", Korea Water Resources Corporation, 2005.
|
5 |
Anuradha Wijesinghe, Loi Lei Lai, "Small Hydro Power Plant Analysis and Development", IEEE International Conference on Electric Utility Deregulation and Restructuring and Power Technologies, July 2011.
|
6 |
S. K. Jeon, S. H. Lee, H. R. Cha, K. S. Kim, J. H. Lee, "Study of 1kW Multi pole and High Efficiency Synchronous Generator for Wind power", KIEE, 14-17, Summer, 2009
|
7 |
A. Dietz, A. Groeger, C. Klingler, "Efficiency improvement of small hydroelectric power stations with a permanent magnet synchronous generator", IEEE International on Electric Drives Production Conference, 93-100P, Sept. 2011.
|
8 |
H. G. Jeong, D. H. Chung, J. Y. So, C. H. Cho, D. K. Kim, "Improved back-EMF of 30kW Interior Permanent Magnet Synchronous Generator for Small Hydropower Generation ", KIEE Electrical Machinery & Energy Conversion Systems Society Annual Autumn Conference 2013 , 2013
|
9 |
Y. U. Park, J. Y. So, D. H. Chung, Y. M. Yoo, J. H. Cho, K. S. Ahn, D. K. Kim, "Optimal design of stator shape for cogging torque reduction of single-phase BLDC motor", The Transactions of the Korean Institute of Electrical Engineers, Vol. 62, No. 11, pp. 1528-1534, 2013
과학기술학회마을
DOI
ScienceOn
|