1 |
IEC Guide:Test Procedures for Synchronous Machines IEEE Std 115-1995 (R2002) 4.1.2 Methods of loss measurement pp 23
|
2 |
Luis Rodriguez and Teodoro SanChez "Designing and Building Mini and Micro Hydropower Scheme" pp11-12
|
3 |
IEC Guide:Test Procedures for Synchronous Machines IEEE Std 115-1995 (R2002) 4.1.1 Efficiency Segregated losses pp 46
|
4 |
IEC Guide:Test Procedures for Synchronous Machines IEEE Std 115-1995 (R2002) 4.1.8 Electric starting pp 25
|
5 |
IEC Guide:Test Procedures for Synchronous Machines IEEE Std 115-1995 (R2002) 4.1.5 Coupled machines pp 24
|
6 |
Lee Seung-won, Lee Youn-jong, "Electric Machines (Korean Edition)", Bosung Company, 1992, pp 256-258
|
7 |
IEC Guide:Test Procedures for Synchronous Machines IEEE Std 115-1995 (R2002) 4.4 Retardation method for losses and saturation curves pp 37
|
8 |
Retardation method for the determination of losses, efficiency and inertia (Andritz Hydro Report)
|
9 |
James M. Gere, Mechanics of Materials-6th edition, Cengage, 2012. pp 186-214
|
10 |
Tidal Power Plant Turbine Shaft Drawing MB9-161.1201
|
11 |
IEC 60041 6.2 "Uncertainty in Measurement" 6.3 "Comparison with guarantees"
|