1 |
IEEE 1547.6 "IEEE Standard conformance Test Procedures for Equipment Interconnecting Distributed Resources with Electric Power System", June, 2009
|
2 |
IEEE 1547.1 "IEEE Standard conformance Test Procedures for Equipment Interconnecting Distributed Resources with Electric Power System", June, 2005
|
3 |
"Interconnected the technique basis in distribution system of distribution generations", Korea Electric Power Corporation (KEPCO), Apr, 2004
|
4 |
Dae-seok Rho, et al., "Optimal Algorithms for Voltage Management in Distributiton Systems Interconnected with New Dispersed Sources", Korea Institute of Electrical Engineers, pp. 192-201, June, 2011
|
5 |
Hyeon-seok Park, et al., "A Study on the Customer Voltage Characteristic Based on the Test Devices for PV Systems", KAIS, pp. 4529-4536, November. 2010
|
6 |
Dae-Seok Rho. et al ,"optimal Operation System of Step Voltage Regulator in Primary Feeders with Distributed Generations", KAIS, pp.2698-2706, June. 2011
|
7 |
Kyung-sang Ryu, et al., "Development of Evaluation Simulator of New Power Sources Using the LabVIEW Software", GDC 2011, CCIS 261, pp. 87-94, 2011
|
8 |
Byung-Ki Kim. et al., " Optimal Operation Methods of Protection Devices in Distribution Systems with PV Systems", Trans. KIEE. Vol. 60A. No. 8, August. 2011
|
9 |
Dae-seok Rho, et al., "A Study on the PV System Modeling Based on the PSCAD/EMTDC", Korea Academia -industrial cooperation societytions, pp. 69-72, May, 2010
|
10 |
Kyung-sang Ryu, et al., "The Detailed Modeling for PV System Based on the PSCAD/EMTDC" KAIS, pp. 461-465, June, 2012
|