Browse > Article
http://dx.doi.org/10.5370/KIEE.2012.61.8.1172

Monitoring Performance of Camera under the High Dose-rate Gamma Ray Environment  

Cho, Jai-Wan (한국원자력연구원)
Jeong, Kyung-Min (한국원자력연구원)
Publication Information
The Transactions of The Korean Institute of Electrical Engineers / v.61, no.8, 2012 , pp. 1172-1178 More about this Journal
Abstract
In this paper, the gamma ray irradiation test results of the CCD cameras are described. From the low dose-rate (2.11 Gy/h) to the high dose-rate (150 Gy/h) level, which is the same level when the hydrogen explosion was occurred in the 1~3 reactor unit of the Fukushima nuclear power plant, the monitoring performance of the cameras owing to the speckles are evaluated. The numbers of speckles, generated by gamma ray irradiation, in the image of cameras are calculated by image processing technique. And the legibility of the sensor indicator (dosimeter) owing to the numbers of the speckles is presented.
Keywords
High dose-rate gamma ray; Fukushima nuclear power plant; Speckle; Packbot;
Citations & Related Records
연도 인용수 순위
  • Reference
1 홍석붕, "고 선량율 감마선 조사에 따른 렌즈의 열화", Trans. KIEE. Vol. 58, No.7, pp 1450-1455, 2009
2 Japan Nuclear Emergency Response Headquarters, "Executive Summary of the Interim Report - Investigation Committee on the Accidents at Fukushima Nuclear Power Stations of Tokyo Electric Power Company", December 26, 2011
3 J.W. Cho, "Remote Controlled Robots Used for the Mitigation of the Fukushima Nuclear Power Plant Accident", 2011 ICROS 대전충청지부 학술대회, 2011. 12
4 Chiba Institute of Technology, "Quince 에 의한 후쿠시마 원발 대응", http://www.furo.org/ja/robot/quince.html
5 J. Nakayama, "Information Gathering Robots for Nuclear Accidents", Kobe Steel Engineering Reports, Vol. 53, No.3, pp89-91, 2003
6 일본 Remote Project Control Team, "범용중장비와 로봇의 내방사선 특성평가와 관리방법의 기본적 고려방안", http://roboticstaskforce.wordpress.com/
7 일본 원자력 연구개발기구, "부정지 이동로봇 Quince 전자부품의 내방사선 시험", http://www.furo.org/ja/robot/quince.html, 2011. 4
8 (주) 동경전력, "후쿠시마 제1 원자력발전소 3호기 격납용기기기 hatch rail 청소 후 조사상황", http://www.tepco.co.jp/nu/library/movie.html, 2011. 11
9 (주) 동경전력, "후쿠시마 제1 원자력발전소 2호기 원자로건물 5층 로봇(Quince 2호) 조사상황", http://www.tepco.co.jp/nu/library/movie.html, 2012. 2
10 (주) 동경전력, "후쿠시마 제1 원자력발전소 2호기 Torus 실내 북동측 맨홀부근 (PCV 측 배관조사상황", http://www.tepco.co.jp/nu/library/movie.html, 2012. 4
11 (주) 동경전력, "후쿠시마 제1 원자력발전소 2호기 격납용기 내부조사", http://www.tepco.co.jp/nu/library/movie.html, 2012. 3