Abstract
This paper proposes a reliability evaluation for interconnection planning using a tie line equivalent assisting generator model (TEAG) that considers the uncertainties of the interconnected transmission systems and the tie lines. Development of this model was triggered by the need to perform probabilistic reliability evaluations on the NEAREST (North East Asia Region Electric Systems Tied) interconnection. The TEAG is the basis for the newly developed interconnection systems reliability evaluation computer program, NEAREL. The model is capable of considering uncertainties associated with generators, tie lines, and the tied grids. Reliability evaluations for six interconnection scenarios involving the power systems of six countries in the Asian north eastern region were performed using NEAREL. Sensitivity analysis was used to determine reasonable tie line capacities for three interconnected country scenarios of the six countries. Test results and summarized comments of the scenarios are included in the paper.
Keywords
Interconnection; System reliability evaluation; Northeast Asia; TEAG;
Citations & Related Records

Times Cited By SCOPUS : 0
연도 인용수 순위
  • Reference
1 Jaeseok Choi, Hongsik Kim, Junmin Cha and Roy Billinton, 'Nodal Probabilistic Congestion and Reliability Evaluation of a Transmission System under Deregulated Electricity Market', IEEE, PES, SM2001, 7, 2001
2 Jaeseok Choi, Trung Tinh Tran, Sungrok Kang,Park, Jaeyoung Yoon,Seungil Moon,andRoy Billinton, 'Tie Line Constrained Equivalent Assisting Generator Model (TEAG) Considering Forced Outage Rates of Transmission Systems', KIEE, International Journal on PE, 6, 91-99, 2004
3 J.S. Choi, D.H. Do, S.P. Moon and R. Billinton, 'Development of a Method for ELDC Construction in a Composite Power System', in Proceedings of Large Engineering Systems Conference on Power System'99 (LESCOPE'99), 6, 189-194, 1999
4 Trung Tinh Tran, Jaeseok Choi, Hyungchul Kim, Seungil Moon and Roy Billinton, 'Development of Tie Line Constrained Equivalent Assisting Generator Model (TEAG) For Reliability Evaluation of NEAREST-III, KIEE, International Journal on PE, 3, 31-39, 2005
5 Sergei Podkovalnikov, 'Study for Russia, Democratic People Republic of Korea, Republic of Korea, and China Power Interconnection Analysis of Current Status', Report of Energy Systems Institute Siberian Branch, Russian Academy of Sciences, Irkutsk, 664033, Russia, 1-42, 2002
6 Jaeseok Choi, Hongsik Kim, Seougpil Moon and Roy Billinton, 'Nodal Probabilistic Production Cost Simulation and Reliability Evaluation at Load Points of Composite Power System', UPEC2001, Swansea 9, 2001
7 J. Choi, R. Billinton, M. Futuhi-Firuzabed, 'Development of A New Nodal Effective Load Model Considering of Transmission System Element Unavailabilities', IEE. G.T&D, 6, 79-89, 2005
8 R. Billinton and R. N. Allan, 'Reliability Evaluation of Power Systems', Plenum Press Pub, 1984
9 J.S. Choi, S.P. Moon, H.S. Kim, B.G Lee and R. Billinton, 'Development of ELDC and Reliability Evaluation of Composite Power System Using Monte Carlo Method', IEEE PES SM2000 Conference, 7, 2000
10 S.P. Moon, J. B. Chu, D. H. Jeon, H. S. Kim, J. S. Choi and R. Billinton, 'Transmission System Reliability Evaluation of KEPCO System in Face of Deregulation', IEEE PES SM2002 Conference, 7, 2002
11 Jaeseok Choi, Seougpil Moon, Hongsik Kim, Jinjung Kang, Hoyong Kim and Roy Billinton, 'Development of an Analytical Method for Outage Cost Assessment in a Composite Power System', PowerCon 2000, 2000