Browse > Article

Analysis of Common Grounding Effect during the Transient State in Underground Transmission and Distribution Systems  

Lim, Kwang-Sik (원광대 대학원 전기공학과)
Lee, Jong-Beom (원광대 공대 전기전자 및 정보공학부)
Publication Information
The Transactions of The Korean Institute of Electrical Engineers / v.57, no.2, 2008 , pp. 191-197 More about this Journal
Abstract
This paper describes the effect of transient state in underground transmission and distribution lines installed together in the same tunnel. Two systems installed in the same tunnel are operated by the common grounding. This paper analyzed that how much one of the two kinds of systems influences the other systems during the transient state by EMTP/ATPDraw. Single line-to-ground fault and lightning surge were selected in transient state condition. These cases were simulated variously according to the variation of common grounding magnitude, fault location and lightning surge magnitude. It is evaluated that the analyzed results will be used for establishment and operating materials of common grounding in the same tunnel.
Keywords
Transient state; Same tunnel; Common grounding; Grounding fault; Lightning surge;
Citations & Related Records

Times Cited By SCOPUS : 0
연도 인용수 순위
  • Reference
1 전력연구원, "지중송전계통의 접지기술 정립에 관한 연구(최종보고서)", 1998
2 한국전력공사 중앙교육원, "지중실무 I, II", 2000
3 한국전력공사, "설계기준 - 5001(총칙)", 1998
4 한국전력공사 기술연구원, "지중송전 케이블의 서지 보호대책에 관한 연구(최종보고서)", 1993
5 한국전력공사, "설계기준 - 3500(접지공사)", 1999
6 전력연구원, "송전용량 증대를 위한 열 방산회로 개선에 관한 연구(최종보고서)", 2003
7 한국전력공사, "지중배전과도현상해석 및 보호대책 연구(최종보고서)", 2007
8 전력연구원, "송전케이블 허용전류 산정프로그램 개발 연구(최종보고서)", 2001