1 |
Geon-Pyo Lim, Woong-Jae Jeon, Hyun-Gyu Han, Chan-Wook Park, Ji-Hoon Im, Byung-Hoon Chang. "Automatic control trial run of 54MW power energy storage system for frequency regulation of power system", KIEE summer Conference, pp. 635-636. 2015.
|
2 |
Geon-Pyo Lim, Yo-Han Choi, Ji-Hoon Im, "Development of Operation and Control Technology of Energy Storage System for Frequency Regulation and Operation by Grid Connected Automatic Control", KIEE, vol. 65P, no. 4, pp. 239-241, 2016.
|
3 |
Yo-Han Choi, Geon-Pyo Lim, Tea-Moo Roh, In-Woo Kim, "Development and Demonstration Of 4MW FR ESS Grid-connected Trial Run Automation Technology", KIEE ESS Group Conference, pp. 49-50, 2017.
|
4 |
Geon-Pyo Lim, Yo-Han Choi, In-Gyu Choi, Chan-Wook Park, Seung-Min Lee, "Development of Grid-connected Trial Run Automation Technology of Large Storage of ESS for Frequency Regulation", KIEE Summer Conference, 2017.
|
5 |
Geon-Pyo Lim, "ESS for Frequency Regulation Grid contacted automatic control trial run Manual", KEPCO.
|
6 |
Chan-Wook Park, Seung-Min Lee, Geon-Pyo Lim, "Development and Demonstration of the basic control strategy of ESS trail run automated system for Frequency Regulation", KIEE ESS Group Conference, pp. 51-54, 2017.
|