1 |
Jaeseok Choi, Daeho Do, Seungpil Moon, Roy Billinton, Development of a Method for ELDC Construction in a Composite Power System', Large Engineering Systems Conference on Power System, pp.189-193, June 20-22, Halifax, Canada, 1999
|
2 |
Roy Billinton and Wenyuan Li, Reliability Assessment of Eletric Power Systems Using Monte Carlo Methods, Plenum Press, 1994
|
3 |
Jaeseok Choi, Seougpil Moon, Hongsik Kim, Byongjun Lee and Roy Billinton, 'Development of ELDC and Reliability Evaluation of Composite Power System Using Monte Carlo Method', IEEE PES SM2000, pp. 2063-2068, Seattle,USA, 2000
DOI
|
4 |
Jaeseok Choi, Seougpil Moon, Hongsik Kim, Jinjung Kang, Hoyong Kim, Roy Billinton, 'Development of an Analytical Method for Outage Cost Assessment in a Composite Power System', PowerCon 2000, pp. 1527-1532, Perth, Australia, 2000
DOI
|
5 |
CEA, Industry Restructuring - News & Info: CEA connections online news, March 2000
|
6 |
R.N. Allan, R. Billinton, N.M.K. Abdel-Gawad, 'THE IEEE RELIABILITY TEST SYSTEM-EXTENSIONS TO AND EVALUATION OF THE GENERATING SYSTEM', IEEE Trans. on Power Systems, Vol. PWRS-1, No. 4, pp. 1-7, November 1986
|
7 |
김 홍식, 문승필, 최재석, 노대석, '각 부하지점별 확률론적 발전비용 산정을 위한 수치해석적 방법', 2001년 대한전기학회 전력기술부문회 춘계학술대회 논문집, pp.112-115, 2001
|
8 |
W.S. Read, W.K. Newman, I.J. Perez-Arriaga, H. Rudnick, M.R. Gent, A.J. Roman, Reliability in the New Market Structure (Part2)', IEEE Power Engineering Review, pp.10-16, January 1999
DOI
ScienceOn
|