1 |
Leisch, J. P., Urbanik, T. and Oxley, J. P.(1989), "A Comparison of Two Diamond Interchange Forms in Urban Areas", ITE journal, Vol. 59, No. 5, pp.21-27
|
2 |
Missouri Department of Transportation Research (2004), "Design of Single Point Urban Interchanges"
|
3 |
Garbar, N. J. and Smith, M. J. (1996), "Comparison of the Operational and Safety Characteristics of the Single Point Urban and Diamond Interchanges", Virginia Transportation Research Council, Charlottesville
|
4 |
David, H. and John, A.(2003), "Intersection Capacity Utilization(2003 ed)", Trafficware
|
5 |
Sharp, W. H. and Selinger, M. J.(2000), "Comparison of SPUI and TUDI Interchange Alternatives with Computer Simulation Modeling", ITE Annual Meeting Compendium of Technical Papers
|
6 |
Roser, P. R., Elena, S. P. and William, R. M.(2004), "Traffic Engineering(third ed.)", Prentice Hall
|
7 |
Fowler, B. C.(1993), "An Operational Comparison of the Single-Point Urban and Tight-Diamond Interchanges", ITE journal, Vol. 63, No. 4, pp.19-24
|
8 |
김영찬(1994), "과포화 다이아몬드형 인터체인지의 교통신호제어모형의 개발", 대한교통학회지, 제12권 제2호, 대한교통학회, pp.5-30
|
9 |
Jones, E. G. and Selinger, M. J.(2003), "Comparison of Operation of Single-Point Urban and Tight Urban Diamond Interchanges", Transportation Research Record, no. 1847, pp.29-35
|
10 |
경기도(2006), "중동 IC 하부교차로 개통보고"
|