Browse > Article

An Interval Travel Demand Estimation Method  

Lee, Seung-Jae (서울시립대학교 교통공학과)
Kim, Yong-Hoon (서울시정개발연구원)
Publication Information
Journal of Korean Society of Transportation / v.26, no.2, 2008 , pp. 81-88 More about this Journal
Abstract
This paper presents the travel demand estimation using interval estimation methods during the trip generation stage, and then followed the other three stages of the four stage trip estimation. We have used real data of Dae-jun City. To estimate travel demand using the interval estimation method, a reliability level was set to 95% by a upper bound value, a middle value and a lower bound value. The four stage traffic demand analysis procedure was equally applied and finally interval traffic was estimated. The result showed a difference between maximum values and middle values depending on the destination during the trip generation stage. It depends on an explanation ability of regression analysis. Most of interval estimation ratio resulted in the traffic assignment stage showed ${\pm}5{\sim}18%$ difference on the average and ${\pm}30{\sim}50%$ at the most.
Keywords
Interval-estimation; uncertainty; input data; confidence interval; four stage traffic demand analysis;
Citations & Related Records
연도 인용수 순위
  • Reference
1 교통개발연구원(2005), "교통수요 원단위 분석 연구 보고서"
2 조중래(1998), "통행시간가치의 신뢰구간 추정", 대한교통학회지, 제16권 제4호, 대한교통학회, pp.219-224
3 서울시정개발연구원(1998) "서울시 교통수요 예측모형 정립( I )"
4 대전광역시(2004), "대전광역시 2003년도 교통조사 및 분석 보고서"
5 교통개발연구원(2002), "교통조사.분석의 통계적 신뢰도 개선방안 연구"
6 정천수(1994), "수요예측결과의 평가기준 및 평가방법에 관한 연구", 대한교통학회지, 제12권 제1호, 대한교통학회, pp.63-78
7 대전광역시(2005), "대전광역시 2004년도 교통조사 및 분석 보고서"
8 국토개발연구원(1994), "도로교통량분석 및 예측방법연구"
9 한국개발연구원(2001), "예비타당성 조사 수행을 위한 표준지침 제3판"
10 Caliper(2004), "Travel Demand Modelling with TransCAD"
11 서울특별시(2003), 2002 "서울시 가구통행실태조사"
12 서울시정개발연구원(2002) "교통환경의 적정수준 유지를 위한 도시관리모델 개발연구"