Browse > Article

Design of Maximum Green Time Parameters for Traffic Actuated Operation  

KIM, Jin Tae (Advanced Highway Research Center, Hanyang University)
Publication Information
Journal of Korean Society of Transportation / v.20, no.4, 2002 , pp. 123-134 More about this Journal
Keywords
Traffic Actuated Control; Maximum Green Time Parameter; Average Green Time Estimation; Hybrid Genetic Algorithm; Simulation;
Citations & Related Records
Times Cited By KSCI : 1  (Citation Analysis)
연도 인용수 순위
1 Development of an Average Green Time Estimation Model for Proper Evaluation of Traffic Actuated Operation /
[ Kim,J.T. ] / Journal of the Korean Society of Transportation   과학기술학회마을
2 EVIPAS : A Computer Model for the Optimal Design of a Vehicle-Actuated Traffic Signal /
[ Bullen,A.G.;R.N.Hummon;T.Bryer;R.Nekma ] / TRR, 1114
3 /
[ Husch,D.D. ] / SYNCHRO User's Guide
4 Optimal Timings Settings and Detector Lengths of Presence Mode Full-Actuated Control /
[ Lin,F.B. ] / TRR, 1010
5 Calibration of Performance Models for Traditional Vehicle-actuated and Fixed Time Signlas /
[ Akcelik,R.;E.Chung ] / ARRB. WD TO95/013
6 /
[ Orcutt,F.L. ] / The Traffic Signal Book
7 Development of Guidelines for Implementing Computerized Timing Designs at Traffic Actuated Signals /
[ Courage,K.G.;J.Z.Luh;C.E.Wallace ] / 2 Volumes on Arterial System Implementation
8 Evaluation of the CORSIM Car-flowing Model Using GPS Field Data /
[ Chundury,S.;B.Wolsho ] / TRR, 1710
9 Highway Capacity Manual /
[ TRB ] / Special Report 209
10 Highway Capacity Manual /
[ TRB ] / Special Report 209
11 /
[ Kell,J.H.;I.J.Fullerton ] / Manual of Traffic Signal Design(second edition)
12 Signal Timing Calculation Methods for Vehicle-actuated and Fixed Time Signals /
[ Akcelik,R. ] / ARRB. TO WD95/020
13 /
[ Gen,M.;R.Cheng ] / Genetic Algorithms and Engineering Design
14 /
[ Fu,L. ] / Generic Search, Neural Networks in Computer Intelligence
15 Capacity Analysis of Traffic-Actuated Intersections /
[ Courage,K.G.;D.F.Fambro;R.Akcelik;P.S.Lin;M.Anwar;F.Viloria ] / NCHRP Project 3-48 Final Report