1 |
Hwang U. K., 2015, "Modelling and Test of Downthe-Hole Hammer," Journal of Drive and Control, Vol. 12, No. 2, pp. 34-38.
DOI
|
2 |
Shin, D. Y. and Song, C. H., 2012 "Performance Optimization of Down-the-Hole Hammer Using Taguchi Method," Trans. Korean Soc. Mech. Eng. A, Vol. 36, No. 1, pp. 109-116.
DOI
|
3 |
Markku, T., 2006, Surface Drilling in Open Pit Mining, Atlascopco, First Edition.
|
4 |
Tatiya, R. R., 2009, Surface and Underground Excavations, Balkema, pp. 62-63.
|
5 |
Chiang, L. E. and Elias, D. A., 2000, "Modeling Impact in Down-The-Hole Rock Drilling," International Journal of Rock Mechanics and Mining Sciences, 37, pp. 599-613.
DOI
|
6 |
Bu, C., Qu, Y., Cheng, Z. and Liu, B., 2009., "Numerical Simulation of Impact on Pneumatic DTH Hammer Percussive Drilling," Journal of Earth Science, Vol. 20, No. 5, pp.868-878.
DOI
|
7 |
Park, S. H., 1993, Quality Engineering, Minyoungsa, Seoul, pp. 165-239.
|