1 |
Cha, J. H., Roh, M. I. and Lee, K. Y., 2010, "Integrated Simulation Framework for the Process Planning of Ships and Offshore Structures," Robotics and Computer-Integrated Manufacturing Journal, Vol. 26, No. 5, pp. 430-453.
DOI
ScienceOn
|
2 |
Samsung Heavy Industries Co., Ltd., 2007, Giga-Block Method Using Many Sea-Cranes, Korea Patent No. 10-0718928.
|
3 |
Kim, W. S., Kim, D. W., Kim, B. S. and Yu, W. J., 2008, "Fabrication of Steel Girder for Incheon Bridge," Transactions of the Korean Society of Steel Construction, Vol. 20, No. 3, pp. 89-94.
|
4 |
Ishida, M., Nagai, Y., Fujitani, K. and Nakano, Y., 2003, "The Design and Construction of the Chitose Bridge," Technical Memorandum of Public Works Research Institute, Vol. 3920, pp. 91-104.
|
5 |
Cha, J. H., 2008, Nonlinear Dynamics Response and Discrete Event/Discrete Time Simulation of a Heavy Cargo Suspended by Floating Crane, Ph.D. Thesis, Seoul National University.
|
6 |
Cummins, W. E., 1962, "The Impulse Response Function and Ship Motions," Schiffstechnik, Vol. 9, pp. 101-109.
|