Structural Evaluation of the 300 Ton Goliath Crane |
Shin, Sung-Hwan
(School of Mechanical Engineering, ERI, Gyeongsang Nat'l Univ.)
Kim, Jeong-Kyeong (School of Mechanical Engineering, ERI, Gyeongsang Nat'l Univ.) Song, Chul-Ki (School of Mechanical Engineering, ERI, Gyeongsang Nat'l Univ.) Kim, Bum-Keun (School of Mechanical & Automotive Engineering, Inje Univ.) Bae, Tae-Han (RETRO Co., Ltd.) Kim, Joong-Moon (RETRO Co., Ltd.) |
1 | JIS B 8830, 2001, Calculation Cranes-Wind Load Assessment, Japanese Standards Association, pp.2-3. |
2 | JIS B 8831, 2001, Cranes-Design Principles for Loads and Load Combinations, Japanese Standards Association, pp. 3-9. |
3 | Kim, M.-S., Lee, J.-C., Jeong, S.-Y., Ahn, S.-H., Son, J.-W., Cho, K.-J., Song, C. K., Bae, T.-H. and Park, S. R., 2008, "Structure Evaluation for the Level Luffing Crane's Boom," KSME-A Vol. 32, No. 6 pp 526-532 과학기술학회마을 DOI ScienceOn |
4 | JIS B 8821, 2004, Calculation Standards for Steel Structures of Cranes, Japanese Standards Association, pp.2-14. |
5 | Korea Occupational Safety & Health Agency |