1 |
Lee, M. H., Zhao, Y., Park, J. H., Han, M. C., & Han, C. G. (2013). Periods of Cold Weather Concrete Determined by Korean and Japanese Codes with Climate Data Obtained from Korea. Journal of the Korea Institute of Building Construction, 13(1), 326~328
|
2 |
Go, S. S., & Oh, J. H. (2002). The Study on the Risk Assesment of Formwork, Joural of the Korean Society of Safety, 96~101.
|
3 |
Park, C. W., Lee, B. H., & Hong, S. K. (2011). Mechanical Behavior and Characteristics of Internal Temperature and Relative Humidity of Concrete at Early Age, Journal of the Korea Institute for Structural Maintenance and Inspection, 15(6), 184~194
DOI
|
4 |
Korea Construction Standards Center, (2016). KCS 14 20 12 form and floor post
|
5 |
Han, C. G., Hwang, Y. S., & Sin, B. H. (2002). Determination of Removal Time of the Forms Accroding to the Strength Development of Concrete at Early Age, Journal of the Architectural Institute of Korea, 18(9), 157~162
|
6 |
Kim, J. W., Kim, Y. H., Kim, J. H., & Kim, J. J. (2010). A Study on the Methods of Reducing the Safety Accident through Pattern Analysis of Construction Disasters, Proceeding of Autumn annual Conference in the Korea Institute of Building Construction, 10(2), 137~140.
|
7 |
Han, C. G., Han, M. C., & Kim, M. H. (1998). A Study on the Determination of the Period of cold Weather Concreting on Architectural Execution in Korea, Journal of the Architectural Institute of Korea, 14(11), 71~78.
|
8 |
Law (2021). Construction Technology Promotion Act
|
9 |
Ministry of Land. (2016). concrete standard specification, 93~95
|
10 |
Shin, Y. S. (2021). A Study on the Potential Risk Analysis for the Safety Management in the Formwork. Journal of the Korea Institute of Building Construction, 21(2), 121~128
DOI
|
11 |
Law (2021). Enforcement Decree of the Construction Technology Promotion Act
|
12 |
An, S. H. (2019). Relationship between Managers' Decision-making Participation and Organization Commitment in Building Construction Project, Journal of the Korea Institute of Building Construction, 19(3), 281~287
DOI
|
13 |
Han, M. C., & Lee, J. S. (2017). Determination of the Cold Weather Concreting Period and Early Frost Damage Risk Using Climate Data of Korea. Journal of the Korea Institute of Building Construction, 17(1), 73~81.
DOI
|
14 |
Kim, D. S. (2007). Put the Construction Mixed High Technology to a Power of the World -go to U-con, be construction industry takeoff, Review of Architecture and Building Science, 51(6), 19~24
|
15 |
Park, J. Y., & Kim, G. H. (2021). Importance Analysis of Major Factors in Formwork Collapse Acciden, Journal of the Korea Institute of Building Construction, 21(3), 249~256
DOI
|
16 |
Shin, Y. S., & Choi, E. G. (2010). Quality Assurance of Concrete, Magazine of the Korea Concrete Institute, 22(1), 29~32
DOI
|