Analysis of the Rebar Quantity Take-Off according to the Application of Seismic Reinforcement Details for RC Apartments  

Lee, Jae-Cheol (Department of Architectural Engineering, Tongmyong University)
Publication Information
Journal of the Architectural Institute of Korea / v.36, no.9, 2020 , pp. 167-174 More about this Journal
Abstract
Most of the buildings are built with RC structures. Since much of the construction cost of the RC structure is the cost of rebars, the calculation of the correct amount of rebar is essential for predicting the construction costs. In addition, it is necessary to analyze the effects of the application of seismic reinforcement details on the volume of rebars by analyzing changes in the amount of rebars before and after the application of seismic reinforcement details. The purpose of this study is to calculate and compare the exact amount of rebar before and after the application of seismic reinforcement details to columns, beams, and walls using BIM to provide quantitative data of the variation of rebar volume according to the application of seismic reinforcement details.
Keywords
BIM(Building Information Modeling); Reinforced concrete; Seismic reinforcement details; Rebar QTO(Quantity Take-Off);
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Yoon, J., Cho, H., Lee, J., Shin, J., & Kim, E. (2020). A Comparison of Quantity Take-Offs of RC Structures based on BIM, Journal of Computational Structural Engineering Institute of Korea, 33(1), 35-44.   DOI
2 Ministry of Land, Transport and Maritime Affairs (2018). KDS 14 20 80 :2018 Code for seismic design of concrete, https://www.kcsc.re.kr/StandardCode/Viewer/58#title-1 (accessed Sep. 02, 2020)
3 ChangSoft I&I. (2015). BuilderHub User's Guide, http://chang-soft.com/wp-content/uploads/2015/11/BuilderHub_Tutorial1_ApartmentBuilding_20151019.pdf (accessed Sep. 02, 2020)
4 Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2008). BIM Handbook-A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers, and Contractors, John Wiley & Sons, Inc.
5 Lee, J., Jung, J., & Oh, H. (2013). Work Efficiency Analysis of BIM based Structural Drawing, Journal of Architectural Institute of Korea Structure & Construction, 29(6), 21-28.   DOI
6 Kim., J., Lee, M., Seo, J., Lee, K., & Lim, J. (2013). Ideality and Reality of BIM -A General Contractor's Perspective-, KIBIM Annual Conference, 9-10.
7 Ham, N., & Kim, J. (2016). Perception Analysis on Practical BIM Application : Myths and Truths, KIBIM Annual Conference, 9-10.
8 DONG IL Architects & Engineers (2017). Practice of Construction Management in Field, GSDS.co.kr, 79-81.
9 Ministry of Land, Transport and Maritime Affairs (2010). BIM Guideline for Architectural Field
10 Public Procurement Service (2015). BIM Guideline for Facilities, V1.3
11 Virtual Construction Research Group (2010). BIM Guideline for 3D Architectural Design, Volume 1, V2.0
12 Kim, J., & Yoon, S. (2013). A Verification of the Accuracy in BIM-based Quantity Taking-Off - Focusing on Finishing Work, Journal of KIBIM, 3(2), 1-9.   DOI
13 Kim, C. (2016). Review the usability rebar quantity take-off function of reinforcement concrete frame using BuilderHub, KCI Annual Conference, 555-556.