1 |
Wardhana, K. and Hadipriono, F.C. (2003) "Analysis of recent bridge failures in the United States" Journal of Performance of Constructed Facilities, 17(3), 144-150.
DOI
ScienceOn
|
2 |
Woo, S., Hong, D., Lee, W-.C., Chung, J-.H., and Kim, T-.H. (2008) "A robotic system for road lane painting" Automation in Construction, 17, 122-129.
DOI
ScienceOn
|
3 |
Yamazaki, Y. and Maeda, J. (1998) "The SMART system: an integrated application of automation and information technology in the production process" Computers in Industry, 35, 87-99.
DOI
ScienceOn
|
4 |
Yager, R.R. (1982) "Fuzzy sets and possibility theory" Oxford, Pergamon Press.
|
5 |
Zeng, J., An, M., and Smith, M.J. (2007) "Application of a fuzzy based decision making methodology to construction project risk management" International Journal of Project Management, 25, 589-600.
DOI
ScienceOn
|
6 |
Kim, D-.W., An, S-.H., Cho, H., Jeong, J-.W., Lee, B-.H., Doh, N.L., and Kang, K-.I. (2009) "Development of conceptual model of construction factory for automated construction" Building and Environment, 44, 1634-1642.
DOI
ScienceOn
|
7 |
Kim, Y.S., Jung, M.H., Cho, Y.K., Lee, J., and Jung, U. (2007) "Conceptual Design and Feasibility Analyses of a Robotic System for Automated Exterior Wall Painting" Internal Journal of Advanced Robotic Systems, 4(4), 417-430.
|
8 |
Lee, J-.H., Yoo, H-.S., Kim, Y-.S., Lee, J-.B., and Cho, M-.Y. (2006) "The development of a machine visionassisted teleoperated pavement crack sealer" Automation in Construction, 15, 616-626.
DOI
ScienceOn
|
9 |
Lloyd, R.A. (1979) "Experience curve analysis" Applied Economics, 11, 221-234.
DOI
ScienceOn
|
10 |
Mahdi, I.M. and Alreshaid, K. (2005) "Decision support system for selecting the proper project delivery method using analytical hierarchy process (AHP)" International Journal of Project Management, 23(3), 564-572.
DOI
ScienceOn
|
11 |
Pan, N-.F. (2008) "Fuzzy AHP approach for selecting the suitable bridge construction method" Automation in Construction, 17, 958-965.
DOI
ScienceOn
|
12 |
Ross, T.J. (1995) "Fuzzy logics with engineering applications" New York, McGraw-Hill.
|
13 |
Saaty, T.L. (1980) "The Analytic Hierarchy Process: Planning, Priority Setting, Resource Allocation" New York, McGraw Hill.
|
14 |
Chan, A.P.C., Yung, E.H.K., Lam, P.T.I., Tam, C.M., and Cheung, S.O. (2001) "Application of Delphi method in selection of procurement systems for construction projects" Construction Management and Economics, 19(7), 699-718.
DOI
|
15 |
Tanijiri, H., Ishiguro, B., Arai, T., Yoshitake, R., Kato, M., Morishima, Y., and Takasaki, N. (1997) "Development of automated weather-unaffected building construction system" Automation in Construction, 6, 215-227.
DOI
ScienceOn
|
16 |
Wakisaka, T., Furuya, N., Inoue, Y., and Shiokawa, T. (2000) "Automated construction system for high-rise reinforced concrete buildings" Automation in Construction, 9, 229-250.
DOI
ScienceOn
|
17 |
Buckley, J.J. (1985) "Fuzzy hierarchy analysis" Fuzzy Sets and Systems, 17, 233-247.
DOI
ScienceOn
|
18 |
Chen, C.T. (2000) "Extension of the TOPSIS for group decision-making under fuzzy environment" Fuzzy Sets and Systems, 114, 1-9.
DOI
ScienceOn
|
19 |
Do, H-.M., Kim, Y-.S., Kim, B-.K., Lee, G., and Yun, S-.H. (2009) "Recognition of localization of steel frame material using scan matching method for automation of steel construction" Journal of the Architectural Institute of Korea, 25(3), 93-100.
과학기술학회마을
|
20 |
Fedorowicz, J., Oz, E., and Berger, P.D. (1992) "A Learning Curve Analysis of Expert System Use" Decision Science, 23, 797-818.
DOI
|
21 |
Ham, Y-.B., Kwon, S-.W., Noh, J-.H., Han, J-.G., and Kim, K-.T. (2006) "Development of road stripe removing equipment using high-pressure water jet" Automation in Construction, 15, 578-588.
DOI
ScienceOn
|
22 |
Hadipriono, F.C. (1987) "Fuzzy Set Concepts for Evaluating Performance of Constructed Facilities" Journal of Performance of Constructed Facilities, 2(4), 209-225.
|
23 |
Berry, M.J.A. and Linoff, G.S. (1997) "Data mining techniques" John Wiley & Sons, Inc.
|
24 |
Hsiao, J. (1994) "A comparison of construction automation in major constraints and potential techniques for automation in the united states" MIT, M.S. thesis, Boston.
|
25 |
Ikeda, Y. and Harada, T. (2006) "Application of the automated building construction system using the conventional construction method together" ISARC 2006, 722-727.
|
26 |
Karwowski, W., and Mital, A. (1986) "Potential applications of fuzzy sets in industrial safety engineering" Fuzzy sets and Systems, 19, 105-120.
DOI
ScienceOn
|