1 |
Battikha, M. G. 2002. QUALICON, Computer-based system for construction quality management. Journal of Construction Engineering and Management, March/April. pp.164-173
|
2 |
General Services Administration. 2006. Federal Acquisition Regulation (FAR)
|
3 |
Schexnayder, C. J., and Mayo, R. E. 2003. Construction management fundamentals. pp.491-496
|
4 |
Williams, J. D. 1996. Application of TQM system in the construction industry, Construction Management(Part 2: Cases). Construction and Economy Research Institute of Korea (CERIK). pp.89-111
|
5 |
Barrie, D. S., and Paulson, B. C. 1992. Professional Construction Management : including CM. Design- Construct, and General Contracting. McGraw-Hill, Inc. pp.371-394
|
6 |
Davis, K., and Ledbetter, W. B. 1987. Measuring design and construction quality cost, Construction Industry Institution (CII), Austin, Tex
|
7 |
Voehl, F., and Jackson, P., and Ashton, D. 1994. ISO 9000 - an implementation guide for small to mid-sized business. St. Lucie Press, Inc. pp.99-111
|
8 |
Choi, M. S. 2004. A study to promote efficiency of QC activity by outsourcing quality testing and inspection, The Ministry of Construction and Transportation
|
9 |
Ishido, S. 1996. Construction quality management in Japan - Present and future. Proc., Annual Conference, The Korean Institute for Industrial Safety. pp.32-48.Doune Kun, 1995, Decision making method by the game theory. JUSE Press, Ltd. p.170
|
10 |
Choi, M. S. 2005. A study to improve a quality testing & inspection system in construction work - through benchmarking foreign construction projects, The Journal of Architectural Engineering, the Architecture Institute of Korea (AIK), 21(12) : 143-148
|