Browse > Article
http://dx.doi.org/10.5659/JAIK_SC.2016.32.9.35

Priority Analysis of BIM Technologies Development Using Cluster Analysis  

Yun, Seok-Heon (Department of Architectural Engineering, GyeongSang National University)
Publication Information
Journal of the Architectural Institute of Korea Structure & Construction / v.32, no.9, 2016 , pp. 35-42 More about this Journal
Abstract
In order to complete system using BIM technologies through life cycle of construction project, various tools and technologies which could be used in their phases are to be developed. BIM. In order to develop and adopt BIM technologies systematically through the life cycle of construction projects, it is required to identify the technologies to be develop and establish the strategy for their develop and adopt for construction project. In this study, 106 expected future technologies could be used with BIM are identified with the literature review. In order to establish development priorities of them, cluster analysis is used. As a result of analysis, 5 clusters are identified and they could be used for technology development strategy.
Keywords
BIM; Technology Development; Technology Requirements;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 Jeong, K., Moon. T., & Heo, S. (2010). A Study on U-Service Pool Evaluation and SRM Template for Development of U-City SRM, Journal of Korean Planners Association, 45(2), 289-303
2 Lee, J., & Kim, Y. (2003). A Study on Technology Roadmap for Construction Automation and Robotics, Journal of Architectural Institute of Korea, 19(5), 95-104
3 Lee, S., Kwak, C., Lee, K., Shin, T., Chin, S., & Kim Y. (2009), 2009 Conference Proceedings of Architectural Institute of Korea, 29(1), 677-680
4 Park, H., & Kim, S. (2016), Development of Construction R&D Strategy through the International Construction Market Analysis, Korean Journal of Construction Engineering and Management, 17(2), 49-57
5 Kang, T., Kim, J., & Choi, H. (2014). BIM based FM System Usecase Analysis, KIBIM Annual Conference, 8-9
6 Kumar, P., Balasubramanian, M., & Jagadish, S. (2016). Robotics in Construction Industry. Indian Journal of Science and Technology, 9(23), 1-12.
7 Son, K., & Ryu, H. (2015). Integrated System Development Methodology Design And LCC (Life Cycle Cost) Data Process. Indian Journal of Science and Technology, 8(24), 1-9.
8 Kalyani, B., & Ramchand, H. (2016). A Roadmap to Develop Multi Cloud Computing Systems. Indian Journal of Science and Technology, 9(19), 1-4.
9 Varun, R., Rohith, R., Ranjithh, R., & Krishna, P. (2016). Industrial Automation using Wireless Sensor Networks. Indian Journal of Science and Technology. 9(8), 1-8.
10 BIM Industry Working Group (2011), Strategy Paper for the Government Construction Client Group, BIM Industry Working Group
11 Jusuf, A. (2013), Updates on Singapore BIM Roadmap, International Panel of Experts for BIM, BCA, 2-6
12 Malika, C., Nadia, G., Veronique, B., & Azam, N. (2015). Package 'NbClust'. Retrieved April. 13, 2015 from https://sites.google.com/site/malikacharrad/research/nbclust-package