1 |
Gorog, M. (2009). A comprehensive model for planning and controlling contractor cash-flow, International Journal of Project Management, 27, 481-492.
DOI
|
2 |
Hwee, N., & Tiong, R. (2002). Model on cash flow forecasting and risk analysis for contracting firms, International Journal of Project Management, 20, 351-363.
DOI
|
3 |
Jimenez, L., & Pascual, L., (2008). Multicriteria cash-flow modeling and project value-multiples for two-stage project valuation, International Journal of Project Management, 26, 185-194.
DOI
|
4 |
Kim, K., (2007). System Dynamics using Vensim, Seoul Economics and Management.
|
5 |
Lee M. (2006). The estimation of construciton costs by adopting the EVM mothod on the apartment housing, Journal of the Architectural Institute of Korea, Structure and Construction Section, 22(3), 147-154.
|
6 |
Liu, S., & Wang, C. (2008). Resource-constrained construction project scheduling model for profit maximization considering cash flow, Automation in Construction, 17, 966-974.
DOI
|
7 |
Mavrotas, G., Caloghirou, Y., & Koune, J. (2005). A model on cash flow forecasting and early warning for multi-project programmes: application to the Operational Programme for the Information Society in Greece, International Journal of Project Management, 23, 121-133.
DOI
|
8 |
Park, U. (2007). A study on the assessment model of preliminary cost estimates using support vector machines, Journal of the Architectural Institute of Korea, Structure and Construction Section, 23(4), 165-172.
|
9 |
Yi, K. (2010). A Sigmoid S-curve model on cash flow forecasting for earned value management system, Journal of the Architectural Institute of Korea, Structure and Construction Section, 26(6), 103-110.
|