A Study on Non-working Day Calculation Standards and Days of Non-working for Estimation of Optimum Duration in the Excavation and Foundation Work |
Bang, Jong-Dae
(한국토지주택공사 토지주택연구원)
Song, Sang-Hoon (한국토지주택공사 토지주택연구원) Cho, Gun-Hee (한국토지주택공사 토지주택연구원) Sohn, Jeong-Rak (한국토지주택공사 토지주택연구원) Kim, Jin-Won (한국토지주택공사 토지주택연구원) |
1 | Bang, J. D., Han, C. H., & Kim, S. k. (2004), Optimization of estimating duration of the structural frame for the high-rise apartment housing during the winter season, Korea Institute of Construction Engineering and Management, 5(6), 170-178 |
2 | Jang, M. H., & Yoon, Y.S. (2008), A method of using real-time weather information to manage construction schedule, Architectural Institute of Korea, 24(9), 123-130 |
3 | Jeong, S. N., & Lee, H. K. (2003), A study on the method of decision making for the optimal starting time considering the climate elements, Architectural Institute of Korea, 19(5), 113-120 |
4 | Oh, Y. I., Sohn, J. R., & Lee, J. H. (2002), A study of construction management for five work days per week, Housing & Urban Research Institute Korea National Housing Corporation |
5 | Korea Meteorological Administration, www.kma.go.kr |
6 | Ministry of Government Legislation, www.moleg.go.kr |
7 | Shin, J. W., Ryu, H. G., Lee, H. S., & Park, M. S. (2007), Probabilistic model to forecast the duration of structural work in high-rise building construction considering weather elements, Architectural Institute of Korea, 23(6), 123-132 |
8 | Shin, J. H., Lee, J. A., & Lee, C. S. (2005), The estimation of non-working days for the construction projection project in Incheon region, Korea Institute of Construction Engineering and Management, 6(1), 58-64 |