A Shipyard Simulation System using the Process-centric Simulation Modeling Methodology: Case Study of the Simulation Model for the Shipyard Master Plan Validation |
Jeong, Yong-Kuk
(Dept. of Naval Architecture and Ocean Engineering, Seoul National University)
Woo, Jong-Hun (Dept. of Naval Architecture and Ocean Engineering, Korea Maritime and Ocean University) Oh, Dae-Kyun (Dept. of Naval Architecture and Ocean Engineering, Mokpo National Maritime University) Shin, Jong-Gye (Dept. of Naval Architecture and Ocean Engineering and Research Institute of Marine System Engineering, Seoul National University) |
1 | Lu, R.F. and Sundaram, S., 2002, Manufacturing Process Modeling of Boeing 747 Moving Line Concepts, Proceedings of the 2002 Winter Simulation Conference, pp.1041-1045. |
2 | Butterfield, J., Crosby, S., Curran, R., Price, M., Armstrong, C.G., Raghunathan, S., McAleenan, D. and Gibson, C., 2007, Optimization of Aircraft Fuselage Assembly Process Using Digital Manufacturing, Journal of Computing and Information Science in Engineering, 7(3), pp.269-275. DOI |
3 | Jeong, Y., Yim, H., Jee, H. and Lee, K., 2008, Manufacturing Line Optimization for Discrete Event Simulation and Genetic Algorithm, Transactions of the Society of CAD/CAM Engineers, 13(1), pp.67-75. |
4 | Song, Y.J., Lee, D.K., Choe, S.W., Woo, J.H. and Shin, J.G., 2009, A Simulation-Based Capacity Analysis of a Block-Assembly Process in Ship Production Planning, Journal of the Society of Naval Architects of Korea, 46(1), pp.78-86. DOI |
5 | Hwang, I.H., Noh, J., Lee, K.K. and Shin, J., 2010, Short-term Scheduling Optimization for Subassembly Line in Ship Production Using Simulated Annealing, Journal of the Korea Society for Simulation, 19(1), pp.73-82. |
6 | Song, J.K., 2013, Process Modeling Methodology for Shipyard Production Simulation, Master's Degree Thesis, Seoul National University. |
7 | Lee, D.K., Kim, Y., Hwang, I.H., Oh, D.K. and Shin, J.G., 2014, Study on a Process-centric Modeling Methodology for Virtual Manufacturing of Ships and Offshore Structures in Shipyards, The International Journal of Advanced Manufacturing Technology, 71(1-4), pp.621-633. DOI |
8 | Woo, J.H. and Song, Y.J., 2014, Systematisation of Ship Production Management and Case Study for Ship Block Assembly Factory. International Journal of Computer Integrated Manufacturing, 27(4), pp.333-347. DOI |
9 | Hopp, W.J. and Spearman, M.L., 2008, Factory physics 3rd Edition. McGraw-Hill. |
10 | Lee, P., Lee, D.K., Back, M.G., Shin, J.G. and Choi, Y.R., 2012, An Implementation of the Unit Model for Manufacturing Simulation of Shipyard Assembly Shop, Proceedings of the Society of CAD/CAM Engineers Conference, pp.352-356. |
11 | Woo, J.H., 2005, Modeling and Simulation of Indoor Shop System of Shipbuilding by Integration of the Product, Process, Resource and Schedule Information, Ph.D. Thesis, Seoul National University. |
12 | Lee, D.K., 2013, Study on the PPR3-S Information-based Neutral Model and System for Integration and Extension of Shipbuilding Production Planning Simulations, Ph.D. Thesis, Seoul National University. |