1 |
Kim, Y.S. and Kim, J.J., 2005, Design for Hydraulic Hose Routing Paths and Fitting Angles, Society of CAD/CAM Engineers, 10(1), pp. 44-48.
|
2 |
Evans, C.W., 1980, Testing Requirements for Hydraulic Hose, Polymer Testing, 1(1), pp. 39-49.
DOI
ScienceOn
|
3 |
Kim, B.T. and Kim, H.J., 2003, A Study on the Deformation Characteristics of a High-Pressure Hose with Respect to the Swaging Strokes, The Korean Society of Ocean Engineers, 17(4), pp. 37-42.
|
4 |
Rubber Hose Assemblies for Hydraulic Use, KS B 6371, 2009.
|
5 |
Kim, J.J., 1998, Learning CAD/CAM with CATIA, Bando Publisher, pp. 263-324.
|
6 |
Kim, T.W., Cho, D.Y., Lee, K.Y. and Ma, Weiyin, Automatic Weight Computation for Smoothing NURBS Curve Interpolation, Curve and Surface Modeling, IJCC 2006 on Digital Engineering, pp. 32-38.
|
7 |
Piegl, L., 1989, Modifying the Shape of Rational b-Spline. Part 1: Curves, Computer-Aided Design, pp. 509-518.
|
8 |
Hu, S.M., Li, Y.F. and Zhu, X., 2001, Modifying the Shape of NURBS Surface with Geometric Constraints, Computer-Aided Design, 33, pp. 903-912.
DOI
ScienceOn
|
9 |
Liu, X.Y., 2009, Geometric Features Modification of NURBS Curves via Energy Optimization, Education Technolohy and Computer Science, pp. 929-932.
|
10 |
Garret, N. Vanderplaats, 1999, Numerical Optimization Techniques for Engineering Design 3rd Edtion, Vanderplaats Research & Development. Inc., pp. 168-182.
|