Browse > Article
http://dx.doi.org/10.7315/CADCAM.2012.17.1.026

A Scheduling System based on DBMS for Shipbuilding  

Lee, Dong-Uk (아주대학교 산업공학과)
Kim, Shun-Kyum (아주대학교 산업공학과)
Lee, Ho-Yoon (아주대학교 산업공학과)
Park, Sung-Kyu (대우조선해양(주) 중앙연구소 생산시스템연구)
Lee, Dae-Hyeong (대우조선해양(주) 중앙연구소 생산시스템연구)
Wang, Gi-Nam (아주대학교 산업정보시스템 공학부)
Abstract
Assembly scheduling in shipbuilding is responsible for determine assembly process orders and departmental production schedule for the block, the basic composite unit of ships. It is necessary much more information to decide production scheduling as the characteristic of shipbuilding which has been more complex and more various and also, a lot of waste of time and of human power is generated in the course of data processing. The target shipbuilding manufacturer of this study use empirical techniques, based on the user's discretion, to compile and to apply data which are scattered in DB storages separately. Because of that reason, the user should not only be performed identification and screening operations but also modification and verification for vast amounts of data, so it is hard to keep the consistency of the data and also the operation time is not constant. Accordingly, the object in this study is by presenting an efficient DB framework to reduce wasting time and man-hour at experienced-oriented process, abate user's manual operations and support an efficient scheduling in assembly processes.
Keywords
Shipbuilding; Scheduling; DB; Assembly process; DBs framework; Integrated DB System;
Citations & Related Records
Times Cited By KSCI : 3  (Citation Analysis)
연도 인용수 순위
1 이정승, 이재규, "조선에서 조립 공장간 통합 일정 계획 시스템의 개발", 대한산업공학회, '98 춘계공동학술대회 논문집, Session A, 1998
2 한재민, 황인수, "프로젝트 스케듈링을 위한 데이터 베이스시스템의 설계 및 구현", 대한산업공학회, 춘계학술대회논문집, Vol. 1, No. 0, pp.760-771, 1995.
3 박주철 외 4명, "조선 기본 계획 수립 시스템의 개발", 산업공학회지 8권, Pages 65-75, 1998
4 여성주, 구락조, 왕지남, "The Study on a Framework of Manufacturing System in Shipbuilding Industry", 대한설비관리학회 추계학술대회, 2008.
5 Shin J. G., Kwang Kook Lee, Jong Hun Woo, Won Don Kim, Jang Hyun Lee, Se Hwan Kim, Ju Yong Park, Park, Hyunjune Yim, "A Modeling and Simulation of Production Process in Subassembly Lines at a Shipyard", Journal of Ship Production, vol.20 No.2 pp79-83, 2004
6 우종훈, "제품, 공정, 설비와 일정 정보를 통합한 선박 건조 내업 시스템의 모델링 및 시뮬레이션", 공학박사학위논문, 서울 대학교, 2005
7 양선모, 이순요, 이석주, "조선업의 CIM 시스템을 위한 생산정보 시스템의 구축방안에 관한 연구", 한국자동제어학회논문집, 1992.10.19-21.
8 신종계, 이장현, 우종훈, "디지털 선박생산(Digital Shipbuilding) 개념", 대한조선학회지, 제 38권, 제1호, 2001.   과학기술학회마을
9 Odabase, A. Y. "Information System Models - as a Tool for Shipyard Planning and Control", Journal of Ship Production, Vol. 6, No. 4, pp.219-231, Nov. 1990.
10 Koyama, K. "The Role of Computer Ship Integrated Manufacturing for the Further Ship Building", Proceedings of 4th International Marine System Design conference, 1991
11 Baker, K. R. "Introduction to Sequence and Scheduling", New York: John Wiley & Sons, 1974.
12 Bowman, E. "The Schedule-Sequencing Problem", Operations Research, Vol. 7, No. 3, pp.621-624, 1959   DOI   ScienceOn
13 Conway, R, Maxwell W and Miller, L. "Theory of Scheduling", Reading, MA: Addison-Wesley, 1967.
14 황세윤 외 4명, "카탈로그 데이터베이스를 이용한 선박 배관부품의 효과적인 모델링 절차 개발 사례", 한국 CAD/CAM학회 논문집, 제15권, 제1호, pp. 60-69, 2010.   과학기술학회마을
15 Sabuncouglu, I. "Study of Scheduling rules of Flexible Manufacturing System: a Simulation Approach", Int. J. Prod. Res., Vol. 36, No. 2, pp. 527-546, 1998.   DOI   ScienceOn
16 김준환, 한순홍, "STEP 데이터베이스를 Native Storage로 가지는 3차원 선체 CAD에서 형상 모델링 커널과 데이터베이스간의 인터페이스", 한국 CAD/CA 학회 논문집, 제7권, 제3호, pp.202-209, 2002.   과학기술학회마을