For Accuracy Improvement of High-tech Factory Construction Costs Predictions, Derivation of Correction Factors by Factory Capacity  

Choi, Seong Hoon (성균관대학교 미래도시융합공합과)
Kim, Jinchul (성균관대학교 미래도시융합공합과)
Oh, Jae Young (성균관대학교 미래도시융합공합과)
Kwon, Soonwook (성균관대학교 미래도시융합공합과)
Publication Information
Abstract
The high-tech industry, a highly knowledge-intensive industry based on advanced technologies such as electronics, new materials, and IT, is developing rapidly centering on the semiconductor, display, and battery fields. The market size of this industry is continuously increasing, and various challenges are coming forward due to various factors such as changes in the market, changes in demand, and the requirements of the clients. Many strategies are being implemented to advance the start-up time of factories, such as fast-track construction and basic line construction. Therefore, construction of high-tech factory is required to respond to various types of construction plans and early decision making, and an accurate and reliable method of calculating construction costs is needed. In this study the existing construction type was classified into the overall line configuration considering the total production of the factory, and a basic line configuration for quick production start-up. The correction ratio/value for each detailed construction required to calculate the construction cost of the basic line configuration type was derived. Finally, reliability and accuracy were verified by applying the correction ratio suggested in this study to a new high-tech factory construction project.
Keywords
High-Tech Factory; Cost Estimating; Correction Ratio/Value;
Citations & Related Records
연도 인용수 순위
  • Reference
1 이승창, "하이테크 산업 내 시장 진입전략 비교연구," MS thesis, 고려대학교, 2014.
2 Suarez, Fernando and Gianvito Lanzolla, The half-Truth of First-Mover Advantage, Harvard Business Review, April, pp.121-127, 2005.
3 김현중, 최재현, "플랜트 건설 프로젝트를 위한 개산견적 방법론 개발," 한국건설관리학회논문집, 제20권, 제1호, pp.141-150, 2019.   DOI
4 우성권, 정영수, "공사실적자료를 이용한 개략견적시스템의 보정계수 Database 구축 및 활용 사례," 대한토목학회논문집, 제21권, 제5호, pp.695-702, 2001.
5 N. Kang and J. Choi, "Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit," Korean Journal of Construction Engineering and Management, Vol.18, No.3, pp.42-51, 2017.   DOI
6 최성훈, 김진철, 권순욱, "하이테크 공장의 효율적 건설 사업비 분석 및 예측을 위한 WBS. CBS 기반 건설 정보 분류체계 구축," 한국콘텐츠학회논문지, 제21권, 제8호, pp.356-366, 2021.   DOI
7 조용래, 이광호, 김명순, "산업주도권 확보를 위한 경쟁과 협력 (coopetition) 의 혁신전략: 세계 디스플레이 산업구도 분석," 정책연구, pp.1-228, 2016.