1 |
심재일, 양근혁, "굳지 않은 경량 골재 콘크리트의 공기량, 유동성 및 블리딩 특성," 콘크리트학회 논문집, 22권, 4호, 2010, pp. 559-566.
|
2 |
Kayali, O., "Fly Ash Lightweight Aggregates in High Performance Concrete," Construction and Building Materials, Vol. 22, No. 12, 2008, pp. 2393-2399.
DOI
ScienceOn
|
3 |
양근혁, 문주현, 변항용, "프리스트레스트 경량 콘크리트보의 휨 거동에 대한 부분 프리스트레싱 비와 유효 프리스트레스의 영향," 콘크리트학회 논문집, 23권, 1호, 2011, pp. 39-48.
|
4 |
Tam, A. and Pannell, F. N., "The Ultimate Moment of Resistance of Unbonded Partially Prestressed Reinforced Concrete Beams," Magazine of Concrete Research, Vol. 28, No. 97, 1976, pp. 203-208.
DOI
ScienceOn
|
5 |
Mattock, A. H., Yamakazi, J., and Kattula, B. T., "Comparative Study of Beams with and without Bond," Journal of the American Concrete Institute, Vol. 68, No. 2, 1971, pp. 116-125.
|
6 |
Yang, K. H. and Kang, T. H.-K., "Equivalent-Strain Distribution Factor for Unbonded Tendon Stress at Ultimate," ACI Structural Journal, Vol. 108, No. 2, 2011, pp. 217-226.
|
7 |
Warwaruk, J., Sozen, M. A., and Siess, C. P., Investigation of Prestressed Concrete for Highway Bridges, Part : Strength and Behavior in Flexure of Prestressed Concrete Beams, Bulletin No. 464, Engineering Experiment Station, University of Illinois, 1962, 105 pp.
|
8 |
Naaman, A. E., Burns, N., French, C., Gamble, W. L., and Mattock, A. H., "Stresses in Unbonded Prestressing Tendons at Ultimate: Recommendation," ACI Structural Journal, Vol. 99, No. 4, 2002, pp. 518-529.
|
9 |
Au, F. T. K. and Du, J. S., "Prediction of Ultimate Stress in Unbonded Prestressed Tendons," Magazine of Concrete Research, Vol. 56, No. 1, 2004, pp. 1-11.
DOI
ScienceOn
|
10 |
Harajli, M. H., "On the Stress in Unbonded Tendons at Ultimate: Critical Assessment and Proposed Changes," ACI Structural Journal, Vol. 103, No. 6, 2006, pp. 803-812.
|
11 |
ASTM A 416, Standard Specifications for Steel Strand, "Uncoated Seven-Wire for Prestressed Concrete," America Society for Testing and Materials, 1996, pp. 572-575.
|
12 |
Ozkul, O. K., Nassif, H. N., Tanchan, P. D., and Harajli, M. H., "Rational Approach for Predicting Stress in Beams with Unbonded Tendons," ACI Structural Journal, Vol. 105, No. 3, 2008, pp. 338-347.
|
13 |
Du, G. and Tao, X., "Ultimate Stress of Unbonded Tendons in Partially Prestressed Concrete Beams," PCI Journal, Vol. 30, No. 6, 1985, pp. 72-91.
DOI
|
14 |
ACI Committee 318, Building Code Requirements for Structural Concrete (ACI 318-08) and Commentary (ACI 318R-08), American Concrete Institute, Farmington Hills, MI, 2008, 473 pp.
|
15 |
Collins, M. P. and Mitchell, D., Prestressed Concrete Structures, Prentice-Hall, USA, 1991, 766 pp.
|
16 |
Slate, F. O., Nilson, A. H., and Martinez, S., "Mechanical Properties of High-Strength Lightweight Concrete," ACI Journal, Vol. 83, No. 4, 1986, pp. 606-613.
|
17 |
Wang, P. T., Complete Stress-Strain Curve of Concrete and its Effect on Ductility of Reinforced Concrete Members, PhD thesis, University of Illinois, 1977, 257 pp.
|
18 |
Menegotto, M. and Pinto, P. E., Method of Analysis for Cyclically Loaded Reinforced Concrete Plane Frames, IABSE Preliminary Report for Symposium on Resistance and Ultimate Deformability of Structures Acted on by Well-Defined Repeated Loads, 1973, pp. 15-22.
|