Investigation of Stress Changes in Concrete and Strands according to Cutting Order of the Strands in Pre-tensioned Concrete Slab
![]() |
Moon, Do-Young
(Dept. of Civil, Environmental & Architectural Engineering, Korea University)
Kim, Jang-Ho (Dept. of Civil, Environmental & Architectural Engineering, Korea University) Kim, Gyu-Seon (Korea Infrastructure Safety and Technology Corporation) Yun, Man-Geun (Samsung C&T Corporation) Zi, Goang-Seup (Dept. of Civil, Environmental & Architectural Engineering, Korea University) |
1 | Barnes, R. W., Grove, J. W., and Burns, N. H., “Experimental Assessment of Factors Affecting Transfer Length,” ACI Structural Journal, Vol. 100, No. 6, 2003, pp. 740-748 |
2 | Chen, H. L. and Wissawapaisal, K., “Measurement of Tensile Forces in a Seven-Wire Prestressing Strand using Stress Waves,” Journal of Engineering Mechanics, Vol. 127, No. 6, 2001, pp. 599-606 DOI ScienceOn |
3 | 최영철, “Cracking and Ultimate Behavior of Transversely Prestressed Concrete Box Girder Bridges,” 서울대학교, 박사학위논문, 2005, pp. 1-5 |
4 | Nanni, A., Tanigaki, M., and Hasuo, K., “Bond Anchorage of Pretensioned FRP Tendon at Force Release,” Journal of Structural Engineering, Vol. 118, No. 10, 1992, pp. 2837-2854 DOI |
5 | 신현양, 히로시 오카모토, 박경래, 이충희, “인천대교 FSLM 콘크리트 대블럭 박스 거더 제작 및 가설,” 콘크리트학회지, 19권, 3호, 2007, pp. 31-37 과학기술학회마을 |
6 | 지광습, 김장호, 김규선, “프리텐션 콘크리트 구조물의 디텐셔닝 거동,” 한국콘크리트학회, 가을학술발표회 논문집, 19권, 2호, 2007, pp. 181-184 |
7 | Mirza, J. F. and Tawfik, M. E., “End Cracking in Prestressed Members during Detensioning,” PCI Journal, Vol. 23, No. 2, 1978, pp. 66-78 |
8 | Steinberg, E., Beier, J. T., and Sargand, S., “Effects of Sudden Prestress Force Transfer in Pretensioned Concrete Beams,” PCI Journal, Vol. 46, No. 1, 2001, pp. 640-675 |
9 | 문도영, 김장호, 지광습, 김규선, 윤만근, 박경래, “프리텐션 부재의 긴장재 용접 절단순서에 따른 콘크리트 응력 고찰에 관한 연구,” 한국콘크리트학회, 봄학술발표회논문집, 20권, 1호, 2008, pp. 341-344 |
10 | Stone, W. C. and Breen, J. E., “Behavior of Post-Tensioned Girder Anchorage Zones,” PCI Journal, Vol. 29, No. 1, 1984, pp. 64-109 DOI |
11 | Oh, B. H. and Kim, E. S., “Realistic Evaluation of Transfer Lengths in Pretensioned, Prestressed Concrete Members,” ACI Structural Journal, Vol. 97, No. 6, 2000, pp. 821-830 |
12 | Russell, B. W. and Burns, N. H., “Measurement Transfer Lengths of 0.5 and 0.6 in. Strands in Pretensioned Concrete,” PCI Journal, Vol. 41, No. 5, 1996, pp. 44-65 |
13 | Kannel, J., French, C., and Stolarski, H., “Release Methodology of Strands to Reduce End Cracking in Pretensioned Concrete Girders,” PCI journal, Vol. 42, No. 1, 1997, pp. 42-54 |
14 | 오병환, 김의성, “프리텐션 프리스트레스트 콘크리트 부재의 전달길이 평가 및 영향 인자 연구,” 대한토목학회논문집, 20권, 6A호, 2000, pp. 945-956 |
15 | 오병환, 임시내, 최영철, “프리텐션 PSC부재의 전달길이 해석 및 예측에 관한 연구,” 콘크리트학회 논문집, 16권, 3호, 2004, pp. 293-302 과학기술학회마을 DOI |
16 | 김장호, 문도영, 지광습, 김규선, “긴장재 절단에 따른 프리텐션 부재의 동적 거동 고찰,” 대한토목학회 논문집, 28권, 5A호, 2008, pp. 747-756 |
17 | 김장호, 문도영, 지광습, 김규선, 박경래, “용접 절단에 의한 긴장력 도입 방법이 프리텐션 부재의 콘크리트 응력에 미치는 영향 분석,” 한국전산구조공학회, 정기학술대회 논문집, 21권, 1호, 2008, pp. 368-373 과학기술학회마을 |
![]() |