1 |
Steve Swilley, 'Field implementation of a qualified ultrasonic technique for SG tube inspection at comanche peak,' EPRI Steam-Generator Conference, (2000)
|
2 |
'Steam-Generator Examination Guidelines Rev. 6 App. J: Performance Demonstration for Ultrasonic Examination,' Electric Power Research Institute, (2002)
|
3 |
K. Norring 'Influence of roll transition shape on primary side IGSCC of steam generator tubes,' Specialist Meeting on Steam Generators, Stockholm, Sweden, (1984)
|
4 |
J. Engstrom and K. Norring, 'Primary and secondary cracking at ringhals 2,' in Proceedings: 1983 Workshop on Primary-Side Stress Corrosion Cracking of PWR Steam Generator Tubing, EPRI NP-5498 (1987)
|
5 |
김홍표 외, '원전 1차측 응력부식파괴에 관한 기술현황분석 보고서', KAERI/ AR-556/2000, (2000)
|
6 |
K. Norring, 'Examination of fifteen tubes from steam generator 1 at ringhals 2,' Studsvik report EI-84/56 (1984)
|
7 |
Yutaka Harada, 'Development of depth sizing technology using ultrasonic testing in SG tubes,' 14th EPRI Steam-Generator NDE Workshop, (1995)
|
8 |
Steve Kenefick, 'Ultrasonic examination of axial ODSCC,' 19th Steam-Generator NDE Workshop, (2000)
|