A study on the electric power recovery in generator load test  

Lee, Myoungho (Department of offshore plant management, Korea Marine Engineering University)
Abstract
Lots of electric power has been wasted through the load bank usually in the container boxes during the generator load test of the ship and offshore plant in the new ship building. Therefore in this research, the quantity of wasted electric power through generator load test under construction was investigated on big shipbuilding yard and quantity of electric power that can be recovered is analyzed when produced electric power during the generator load test is connected to KEPCO Grid, according to laboratory's experiment result where recovers electric power produced from small generator connected to KEPCO Grid.
Keywords
Offshore Plant; Shipbuilding; Load Bank; Load test; KEPCO Grid;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Y. J. Jung, Introduction of VFD and Siplink, Technical Report EC-OCT-04-12, Department of Offshore Commissioning, DSME, Korea, 2012 (in Korean).
2 M. H. Lee, "Introduction of Offshore Plant" Sun Hak, pp. 348-351, 2013 (in Korean).
3 K. E. Lee, Total Pazflor FPSO Electric System Management, Technical Report EC-OCT-02-11, Department of Offshore Commissioning, DSME, Korea, 2011 (in Korean)
4 G. A. Raducu, Control of Grid Side Inverter in a B2B Configuration for WT Applications, Master Thesis, Institute of Energy Technology, Alborg University, Denmark, 2008.
5 S. Xiao, T. Wei, K. Xiaojuan, P. Ying, "Design of sub-sea long distance electric power supply system", IEEE, pp. 1760-1763, 2011.