Experimental Study on the Structural Behavior of Typical Bar Connections of Approach Slab in the Integral Abutment Bridge |
You, Sung-Kun
(Research Institute, ISAN Corporation)
Kim, Na-Yeon (Research Institute, ISAN Corporation) Kim, Ho-Seop (Research Institute, ISAN Corporation) Kim, Hyun-Gi (Research Institute, ACEENC inc.) Kim, Young-Ho (Sejin Patent & Law Office) |
1 | Eo, G. T., Jung, E. Y., Kim, N. Y., Kim, C. H., and Chang, S. Y., (2013), "A Feasibility Study of the Effective use of Prefabricated Concrete Voided Slab Preventing Hoop Tension Crack," The Magazine of the Korean Society for Advanced Composite Structures, Vol. 5, No.4, pp.11-20. |
2 | Integral Abutment and Jointless Bridges (2005), Constructed Facilities Center, College of Engineering and Mineral Resources, West Virginia University, The 2005-FHWA Conference. |
3 | Park, J. M., You, S. K., Yhim, S. S., and Yoon, S. J. (2003), "Integral vs. Semi-integral Abutment Bridge," The Magazine of Korean Society of Steel Construction, Vol. 15, No. 1, 2003, pp. 76-80. |
4 | Bridge Design Manual (2011), 3rd Edition, Nov. PCI. |
5 | Brent. M. Phares, Adam S. Faris, Lowell Greiman (2013), Integral Bridge Abutment to Approach Slab Connection, Journal of Bridge Engineering, Vol. 18, 2013 Feb., pp.179-181. DOI |
6 | Design Manual for Integral Bridges(2009), Korea Expressway Corporation. |