|
1 |
A study on platform-based preliminary design guidelines associated with the behaviour of piles to adjacent tunnelling
Jeon, Young-Jin;Lee, Gyu-Seol;Lee, Jae-Cheol;Batbuyan, Chinzorig;Lee, Cheol-Ju;
/
Korean Tunnelling and Underground Space Association
, v.24, no.2, pp.129-151,
|
|
2 |
Concrete plug cutting using abrasive waterjet in the disposal research tunnel
Cha, Yohan;Kim, Geon Young;Hong, Eun-Soo;Jun, Hyung-Woo;Lee, Hang-Lo;
/
Korean Tunnelling and Underground Space Association
, v.24, no.2, pp.153-170,
|
|
3 |
A case study of ground subsidence analysis using the InSAR technique
Moon, Joon-Shik;Oh, Hyoung-seok;
/
Korean Tunnelling and Underground Space Association
, v.24, no.2, pp.171-182,
|
|
4 |
A study on the improvement plans of precision safety inspection and precision safety diagnosis in tunnel structure
Lee, Gyu-Phil;Kim, Jeong-Heum;
/
Korean Tunnelling and Underground Space Association
, v.24, no.2, pp.183-192,
|
|
5 |
Analysis of the influence of existing parallel tunnels according to the location of the new tunnel
Yun, Ji-Seok;Kim, Han-Eol;Nam, Kyoung-Min;Jung, Ye-Rim;Cho, Jae-Eun;Yoo, Han-Kyu;
/
Korean Tunnelling and Underground Space Association
, v.24, no.2, pp.193-215,
|
|
6 |
A study on EPB shield TBM face pressure prediction using machine learning algorithms
Kwon, Kibeom;Choi, Hangseok;Oh, Ju-Young;Kim, Dongku;
/
Korean Tunnelling and Underground Space Association
, v.24, no.2, pp.217-230,
|
|