Browse > Article List

논문
1 Pre-grouting for CHI of EPB shield TBM in difficult grounds: a case study of Daegok-Sosa railway tunnel
Kang, Sung-Wook;Chang, Jaehoon;Lee, Jae-Won;Kim, Dae-Young;Shin, Young-Jin; / Korean Tunnelling and Underground Space Association , v.23, no.5, pp.281-302,
2 Fire resistance assessment of segment lining with PP fiber amount
Choi, Soon-Wook;Kang, Tae-Ho;Lee, Chulho;Kim, Hae Song;Ahn, Byoungcheol;Chang, Soo-Ho; / Korean Tunnelling and Underground Space Association , v.23, no.5, pp.303-314,
3 A case study of life cycle cost analysis on high pressure sodium lamp and LED lamp for tunnel lighting
Lee, Gyu-Phil;Kim, Jeong-Heum; / Korean Tunnelling and Underground Space Association , v.23, no.5, pp.315-323,
4 Case study on design and construction for cross-connection tunnel using large steel pipe thrust method in soil twin shield tunnels underneath airport
Ahn, Chang-Yoon;Park, Duhee; / Korean Tunnelling and Underground Space Association , v.23, no.5, pp.325-337,
5 Stability evaluation of existing subway structure by adjacent excavation in urban tunnelling
Han, Sangmin;Lee, Donghuk;Park, Duhee; / Korean Tunnelling and Underground Space Association , v.23, no.5, pp.339-357,
6 Fire resistance assessment in construction joint of precast fireproof duct slab
Choi, Soon-Wook;Kang, Tae-Ho;Lee, Chulho;Kim, Se Kwon;Kim, Tae Kyun;Chang, Soo-Ho; / Korean Tunnelling and Underground Space Association , v.23, no.5, pp.359-370,