Browse > Article List

논문
1 Assessment of groundwater inflow rate into a tunnel considering groundwater level drawdown and permeability reduction with depth
Moon, Joon-Shik;Zheng, An-Qi;Jang, Seoyong; / Korean Tunnelling and Underground Space Association , v.19, no.2, pp.109-120,
2 Development of numerical model for estimating thermal environment of underground power conduit considering characteristics of backfill materials
Kim, Gyeonghun;Park, Sangwoo;Kim, Min-Ju;Lee, Dae-Soo;Choi, Hangseok; / Korean Tunnelling and Underground Space Association , v.19, no.2, pp.121-141,
3 A probabilistic fragility evaluation method of a RC box tunnel subjected to earthquake loadings
Huh, Jungwon;Le, Thai Son;Kang, Choonghyun;Kwak, Kiseok;Park, Inn-Joon; / Korean Tunnelling and Underground Space Association , v.19, no.2, pp.143-159,
4 Design considerations and field applications on inflatable structure system to protect rapidly flooding damages in tunnel
Kim, Hyeob;Kang, Si-On;Yoo, Kwang-San;Kim, Sang-Hwan; / Korean Tunnelling and Underground Space Association , v.19, no.2, pp.161-177,
5 A study on the factors influencing the segment lining design solved by beam-spring model in the shield tunnel
Kim, Hong-moon;Kim, Hyun-su;Shim, Kyung-mi;Ahn, Sung-youll; / Korean Tunnelling and Underground Space Association , v.19, no.2, pp.179-194,
6 The development of a back analysis program for subsea tunnel stability under operation: transversal tunnel section
An, Joon-Sang;Kim, Byung-Chan;Lee, Sang-Hyun;Song, Ki-Il; / Korean Tunnelling and Underground Space Association , v.19, no.2, pp.195-212,
7 Development of a program to predict the airflow rate and pollutant concentration in complex network-type tunnels
Kim, Hyo-Gyu;Choi, Pan-Gyu;Ryu, Ji-Oh;Lee, Chang-Woo; / Korean Tunnelling and Underground Space Association , v.19, no.2, pp.213-229,
8 Stability analysis of an existing utility tunnel due to the excavation of a divergence tunnel emerging from double-deck tunnel
Nam, Kyoung-Min;Choi, Min-ki;Kim, Jung-Joo;Jafri, Turab H.;Yoo, Han-Kyu; / Korean Tunnelling and Underground Space Association , v.19, no.2, pp.231-248,
9 Anchorage mechanism of inflatable steel pipe rockbolt depending on rock stiffness
Kim, Kyeong-Cheol;Kim, Ho-Jong;Jung, Young-Hoon;Shin, Jong-Ho; / Korean Tunnelling and Underground Space Association , v.19, no.2, pp.249-263,
10 Study on the effect of tail void grouting on the short- and long-term surface settlement in the shield TBM Tunneling using numerical analysis
Oh, Ju-Young;Park, Hyunku;Kim, Dohyoung;Chang, Seokbue;Lee, Seungbok;Choi, Hangseok; / Korean Tunnelling and Underground Space Association , v.19, no.2, pp.265-281,
11 A preliminary study of watertightness and salt water resistance of spray-applied membrane
Choi, Soon-Wook;Kang, Tae-Ho;Chang, Soo-Ho;Lee, Cheol-Ho;Kim, Jintae;Choi, Myung-Sik; / Korean Tunnelling and Underground Space Association , v.19, no.2, pp.283-299,
12 Development of beam-spring model to analyse the stability of double-deck tunnel
Lee, Sang-Hyun;An, Joon-Sang;Kang, Kyung-Nam;Kim, Byung-Chan;Song, Ki-Il; / Korean Tunnelling and Underground Space Association , v.19, no.2, pp.301-317,
13 A study on the air leakage performance improvement of duct coupling for temporary ventilation of long subsea tunnel
Jo, Hyeong-Je;Min, Dea-Kee;Kim, Jong-Won;Lee, Ju-Kyung;Beak, Jong-Hoon; / Korean Tunnelling and Underground Space Association , v.19, no.2, pp.319-333,
14 Application technique on thrust jacking pressure of shield TBM in the sharp curved tunnel alignment by model tests
Kang, Si-on;Kim, Hyeob;Kim, Yong-Min;Kim, Sang-Hwan; / Korean Tunnelling and Underground Space Association , v.19, no.2, pp.335-353,