|
1 |
Development of Real-Time Optimal Bus Scheduling Models
Kim, Wongil;Son, Bongsoo;Chung, Jin-Hyuk;Lee, Jeomho;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.587-595,
|
|
2 |
Develpoment of Customer Satisfaction Model of Providing Traffic Information through VMS on the Freeway
Kim, Jang Wook;Kim, Tae Hee;Lee, Soo Beom;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.597-607,
|
|
3 |
A Study on the Construction of Geospatial DB for the Connectivity Transfer Pedestrian Concierge Service
Kang, Kyung Hoon;Lee, Seung Taek;Oh, Seung;Kim, Hwang Bae;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.609-615,
|
|
4 |
Timed-Transfer System: its Application and Effects on Bus Transit System
Shin, Yong Eun;Nam, Hye Gyeong;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.617-625,
|
|
5 |
Development of Measure of Effectiveness (MOE) and Algorithm for Hazard Level at Curve Sections
Ha, Tae-Jun;Jeong, Jun-Hwa;Lee, Jeong-Hwan;Lee, Suk-Ki;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.627-638,
|
|
6 |
Analysis of Basic Characteristics for Providing Parking Information
Lee, Eui Eun;Lee, Jun kyung;Kim, Ji Young;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.639-647,
|
|
7 |
A Traffic Equilibrium Model with Area-Based Non Additive Road Pricing Schemes
Jung, Jumlae;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.649-654,
|
|
8 |
Analyzing Site Reliability for Residential, Civil and Plant Projects using Lean Construction Principles
Koo, Bonsang;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.655-664,
|
|
9 |
Tunnel Cost Estimating Model Based on Standard Section and Cost Variance Index (I) - Analysis Of Critical Cost Factors -
Cho, Jeongyeon;Kim, Kyong Ju;Kim, Kyoungmin;Kim, Sang Kwi;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.665-675,
|
|
10 |
A Standard Section-Based Approximate Cost Estimating Model on Tunnel (II) - Cost Variance Index Table and Test -
Cho, Jeongyeon;Kim, Sang-Kwi;Kim, Kyoungmin;Kim, Kyong Ju;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.677-684,
|
|
11 |
Estimating System for Responsible Days of Schedule Delay for Construction Projects through Time Impact Analysis
Kang, Leen-Seok;Kwon, Jung-Hee;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.685-694,
|
|
12 |
Risk Assessment on the Water BOT Business Participation in China : Domestic EPC Contractor's View
Choi, Jae-ho;Li, Shoushuang;Lee, Seungho;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.695-703,
|
|
13 |
A Study on the Decision Making for Location Selection of Large-scale Discount Stores
Shim, Jae Heon;Lee, Sung Ho;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.705-712,
|
|
14 |
Analysis of Spatial Association of Regional Economic Growth and Land Use Considering Regional Economic Sphere
Choi, Yeol;Kim, Hyun;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.713-721,
|
|
15 |
A Study on the Problems and the Betterment Plan in Operating District Units Plan of the City in Busan Metropolitan
Kim, Jong Gu;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.723-734,
|
|
16 |
Assessment of the New Capacity and LOS of Transfer Facilities in the High-speed Railway Stations
Kim, Jonghae;Kim, Sigon;Lee, Kyung-no;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.735-740,
|
|
17 |
Development of Hybrid Geoid using the Various Gravimetric Reduction Methods in Korea
Lee, Dong-Ha;Lee, Suk-Bae;Kwon, Jae Hyoun;Yun, Hong-Sic;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.741-747,
|
|
18 |
Development of 3D GIS System for the Visualization of Flood Inundation Area
Lee, Geun Sang;Jeong, Il Young;
/
Korean Society of Civil Engeneers
, v.28, no.5D, pp.749-757,
|
|