|
1 |
Machine Diagnosis Techniques by Simplified Calculation Method
Takeyasu, Kazuhiro;Amemiya, Takashi;Iino, Katsuhiro;Masuda, Shiro;
/
Korean Institute of Industrial Engineers
, v.2, no.1, pp.1-8,
|
|
2 |
Predicting Due Dates under Various Combinations of Scheduling Rules in a Wafer Fabrication Factory
Sha, D.Y.;Storch, Richard;Liu, Cheng-Hsiang;
/
Korean Institute of Industrial Engineers
, v.2, no.1, pp.9-27,
|
|
3 |
A Pickup and Delivery Problem Based on AVL and GIS
Hwang, Heung-Suk;
/
Korean Institute of Industrial Engineers
, v.2, no.1, pp.28-34,
|
|
4 |
Disassembly and Classification for Recovery of EOL Products
Min, Sun-Dong;Matsuoka, Shinobu;Muraki, Masaaki;
/
Korean Institute of Industrial Engineers
, v.2, no.1, pp.35-44,
|
|
5 |
ERP-Enterprise Resource Planning: System Selection Process and Implementation Assessment
Han, Sung-Wook;
/
Korean Institute of Industrial Engineers
, v.2, no.1, pp.45-54,
|
|
6 |
Analysis of Information Behavior in Determination of Product Specifications Based on a Conjoint Measurement Approach and a Fusion Model
Ishii, Kazuyoshi;Ichimura, Takaya;Hiraki, Shusaku;
/
Korean Institute of Industrial Engineers
, v.2, no.1, pp.55-62,
|
|
7 |
A Case Study of Bus-Gearboxes Maintenance using Arithmetic Processes
Francis, LeungKit-Nam;Lai, Kin-Keung;
/
Korean Institute of Industrial Engineers
, v.2, no.1, pp.63-70,
|
|