Browse > Article List

논문
1 Batch Scheduling Problem with Multiple Due-dates Constraints
Mohri, Shintaro;Masuda, Teruo;Ishii, Hiroaki; / Korean Institute of Industrial Engineers , v.10, no.1, pp.1-6,
2 A Shaking Optimization Algorithm for Solving Job Shop Scheduling Problem
Abdelhafiez, Ehab A.;Alturki, Fahd A.; / Korean Institute of Industrial Engineers , v.10, no.1, pp.7-14,
3 Heuristic Algorithms for Parallel Machine Scheduling Problems with Dividable Jobs
Tsai, Chi-Yang;Chen, You-Ren; / Korean Institute of Industrial Engineers , v.10, no.1, pp.15-23,
4 A Hybrid Genetic Algorithm for the Location-Routing Problem with Simultaneous Pickup and Delivery
Karaoglan, Ismail;Altiparmak, Fulya; / Korean Institute of Industrial Engineers , v.10, no.1, pp.24-33,
5 Limiting the Number of Open Projects to Shorten the NPD Schedule
Wang, Miao-Ling;Yang, Chun-I;Chang, Sheng-Hung; / Korean Institute of Industrial Engineers , v.10, no.1, pp.34-42,
6 Establishment of "A-PPNS", A Navigation System for Regenerating the Software Development Business
Sakai, Hirotake;Waji, Yoshihiro;Nakamura, Mari;Amasaka, Kakuro; / Korean Institute of Industrial Engineers , v.10, no.1, pp.43-53,
7 A Case Study of Human Resource Allocation for Effective Hotel Management
Murakami, Kayoko;Tasan, Seren Ozmehmet;Gen, Mitsuo;Oyabu, Takashi; / Korean Institute of Industrial Engineers , v.10, no.1, pp.54-64,
8 Rule Induction Considering Implication Relations Between Conclusions
Inuiguchi, Masahiro;Inoue, Masanori;Kusunoki, Yoshifumi; / Korean Institute of Industrial Engineers , v.10, no.1, pp.65-73,
9 Heuristic Approach for Lot Sizing and Scheduling Problem with State Dependent Setup Time
Han, Jung-Hee; / Korean Institute of Industrial Engineers , v.10, no.1, pp.74-83,
10 Barrier Option Pricing with Model Averaging Methods under Local Volatility Models
Kim, Nam-Hyoung;Jung, Kyu-Hwan;Lee, Jae-Wook;Han, Gyu-Sik; / Korean Institute of Industrial Engineers , v.10, no.1, pp.84-94,