Browse > Article List

논문
1 The Algorithm of Life Time Diagnostics end Evaluating of Exchanges Time about High Pressure Sodium Vapor Lamp Using the LabVIEW Software Package
Han, Tae-Hwan; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.1-7,
2 The Theoretical Analysis about the Phase-Shifting Technique of Shearography Using Waveeplates
Kim, Soo-Gil; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.8-13,
3 Automotive Headlight Control System Using Tilt and Photo Sensors
Kim, Tae-Woong; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.14-21,
4 A Study of the Selection of the Valuation Items of the Environmental Illumination Design for a Bridge
Cho, Hyun-Choul; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.22-30,
5 A Study on the Improvement of Resolution of Optical Coherence Tomography System Using Femto-Second Laser
Yang, Sung-Kuk;Park, Yang-Ha;Chang, Won-Suk;Oh, Sang-Ki;Kim, Hyun-Duk; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.31-36,
6 A Study on Distance Relay of Transmission UPFC Using Artificial Neural Network
Lee, Jun-Kyong;Park, Jeong-Ho;Lee, Seung-Hyuk;Kim, Jin-O; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.37-44,
7 A Study on the PLD Circuit Design of Pattern Generator
Roh, Young-Dong;Kim, Joon-Seek; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.45-54,
8 Identification of FOPDT Process Using the Real-Coded Genetic Algorithm
Choi, Hong-Kyu;Shin, Gang-Wook; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.55-62,
9 A Study on the Efficiency Improvement of Three Phase Induction Motor System Driving ZCS(Zero Current Switching) Inverter
Bae, Jin-Yong;Kim, Yong;Baek, Soo-Hyun;Lee, Eun-Young;Kim, Pill-Soo;Choi, Geun-Soo; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.63-69,
10 Fault Diagnosis of 3 Phase Induction Motor Drive System Using Clustering
Park, Jang-Hwan;Kim, Sung-Suk;Lee, Dae-Jong;Chun, Myung-Geun; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.70-77,
11 Direct Load Control Using Priority Based Dynamic Programming
Kim, Tae-Hyun;Lee, Seung-Youn;Shin, Myong-Chul;Cha, Jae-Sang;Suh, Hee-Seok;Kim, Jong-Boo;Choi, Sang-Yul; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.78-83,
12 The Design of a Pre-Compensator for the Model-Following Control in the I-PD Control System
Ha, Hong-Gon; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.84-90,
13 The Measurement & Analysis of Voltage Unbalance Factor at LV Customer of Three-Phase Four-Wire System
Kim, Jong-Gyeoum;Park, Young-Jeen; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.91-99,
14 The Analysis of Actual Condition and Technical Standards for Electrical Facilities in Amusement Electric Trains in Amusement Parks
Kim, Han-Sang;Bae, Suk-Myong;Bang, Sun-Bae;Lee, Gyun-Ho;Kim, Gi-Hyun;Kim, Chong-Min; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.100-107,
15 Control of Inverted Pendulum Using Continuous Time Deadbeat Control
Kim, Seung-Youal;Lee, Keum-Won; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.108-113,
16 Allocation of Real Power losses to Individual Loads Under Competition of Deregulated Power Industries
Ro, Kyoung-soo; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.114-120,
17 Application Technology and Development of CAN Fieldbus Modules for Building Automation and Control System
Hong, Won-Pyo;Seo, Young-Duk; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.121-127,
18 A Study on DC-DC Power Supply for Magnetically Levitated Vehicle
Chun, Choon-Byeon;Jeon, Kee-Young;Lee, Hoon-Goo;Han, Kyung-Hee; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.128-135,
19 Characterisrics of Dissolved Gas Distribution in Oil with Thermal and Electrical Degradation in Oil Imersed Paper Insulation
Sun, Jong-Ho;Yi, Sang-Hwa;Kim, Kwang-Hwa; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.136-144,
20 A Study on the Potential Interference Analysis in the Isolated Grounding System by Field Tests
Kim, Kyung-Chul;Choi, Jong-Kee;Paik, Seung-Hyun;Park, Sang-Young;Kim, Jong-Uk; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.145-151,
21 Optimum Design of BLDC Motor Magnet Using Genetic Algorithm and Response Surface Method
Kim, Chang-Eob;Jeon, Mun-Ho; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.152-157,
22 Short-Term Dynamic Line Rating Prediction in Overhead Transmission Lines Using Weather Forecast System
Kim, Sung-Duck;Lee, Seung-Su;Jang, Tae-In;Kang, Ji-Won;Lee, Dong-Il; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.158-169,
23 The Study on the Cycling Time for Interbus
Park, Jang-Hwan; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.170-175,
24 A Model Reduction of Linear Systems with Time Delay in Frequency Domain
Kim, Ju-Sik;Kim, Jong-Gun;Ryu, Jeong-Woong; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.176-182,
25 The Power System for Home Appliance Air-Conditioner using Partial Switching Power Factor Correction Module
Suh, Ki-Young;Mun, Sang-Pil; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.183-190,
26 The Study on the Method of Measurement for Cycle Time of Bus System
Park, Jang-Hwan; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.191-196,
27 The Investigation and Analysis of Field Condition on the Electrical Shock Hazard of Electrical Facilities Used for Temporary Power Supply at Construction Site
Gil, Hyoung-Jun;Lee, Bok-Hee; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.197-204,
28 Design of the Fuel Cell Powered Line-Interactive UPS System
Choi, Woo-Jin;Jeon, Hee-Jong; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.205-212,
29 Development of the Small Gas Boiler Controller Using Web Browser
Shon, Su-Goog; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.213-219,
30 A Study on the Application of UPQC in AC Railway System
Choi, Joon-Ho; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.220-229,
31 A Study on the Effects of Inverter Ripple Currents to the Proton Exchange Membrane Fuel Cell Stack by Using on Equivalent Impedance Model
Choi, Woo-Jin; / The Korean Institute of IIIuminating and Electrical Installation Engineers , v.18, no.6, pp.230-237,