Browse > Article List

논문
1 A Study on the Installation Time and Method of Soundproofing Facilities According to Tunnel Blasting Work
Won, Yeon-Ho;Son, Young-Bok;Jeong, Jai-Hyung; / Korean Society of Explosives and Blasting Engineering , v.25, no.1, pp.1-14,
2 Investigation of Excavation Disturbed Zone Around a Tunnel by Blasting
Kwon, Sang-Ki;Cho, Won-Jin; / Korean Society of Explosives and Blasting Engineering , v.25, no.1, pp.15-29,
3 A Case Study of the New Center-Cut Method in Tunnel : SAV-Cut(Stage Advance V-Cut)
Kim, Dong-Hyun;Lee, Sang-Pil;Lee, Hun-Yeon;Lee, Tae-Ro;Jeon, Seok-Won; / Korean Society of Explosives and Blasting Engineering , v.25, no.1, pp.31-43,
4 The Effect of Performance on Loading Impact of Emulsion Explosive in Long Vertical Borehole
Lee, Young-Ho;Lee, Seung-Chan;Lee, Eung-So; / Korean Society of Explosives and Blasting Engineering , v.25, no.1, pp.45-52,
5 Similitude Law and Scale Factor for Blasting Demolition Test on RC Scale Models
Park, Hoon;Yoo, Ji-Wan;Lee, Hee-Gwang;Song, Jung-Un;Kim, Sung-Kon; / Korean Society of Explosives and Blasting Engineering , v.25, no.1, pp.53-65,
6 Assessment of Rock Mass Properties Ahead of Tunnel Face Using Drill Performance Parameters
Kim, Kwang-Yeom;Kim, Chang-Yong;Chang, Soo-Ho;Seo, Kyeong-Won;Lee, Seung-Do; / Korean Society of Explosives and Blasting Engineering , v.25, no.1, pp.67-77,
7 A Basic Study for Scaled Model Test
Yang, Hyung-Sik;Ha, Tae-Wook;Kim, Won-Beom;Kim, Jong-Gwan;Ryu, Chang-Ha;Choi, Byung-Hee; / Korean Society of Explosives and Blasting Engineering , v.25, no.1, pp.79-84,